Constituent 发表于 2025-3-28 18:32:56

http://reply.papertrans.cn/19/1853/185223/185223_41.png

纬度 发表于 2025-3-28 21:56:31

http://reply.papertrans.cn/19/1853/185223/185223_42.png

绅士 发表于 2025-3-29 00:49:48

Maintaining Robust Schedules by Fuzzy Reasoningonly the most likely duration of operations. This schedule is iteratively “repaired” until some threshold evaluation is found. A repair is found with a local search procedure based on tabu search. Finally, we show which events can lead to reactive scheduling and how this is supported by the repair s

Pelago 发表于 2025-3-29 06:46:31

Book 1998we received papers for this issue, we discovered that MRP II is a topic about which not only management scientists show interest. As the list of authors proves, industrial engineers, computer scientists, and-operations researchers from academia as well as practitioners have contributed to this book.

debacle 发表于 2025-3-29 09:03:47

https://doi.org/10.1057/9781137305497me Planning contrary to an ordinary reorder point system uses time as a decision variable instead of quantity. Cover-Time Planning has like Kanban a built in restriction of work-in-process. Not until previous production is consumed a new production is initiated.

invulnerable 发表于 2025-3-29 11:54:57

https://doi.org/10.1007/978-3-662-03742-3Autodesk Inventor; Manufacturing; algorithms; capacity; control; control theory; decision making; fuzzy rea

entitle 发表于 2025-3-29 17:17:11

978-3-642-08393-8Springer-Verlag Berlin Heidelberg 1998

AVOW 发表于 2025-3-29 22:21:52

http://reply.papertrans.cn/19/1853/185223/185223_48.png

Cholesterol 发表于 2025-3-30 00:15:26

https://doi.org/10.1057/9781137305497. customer service, manufacturing efficiency and inventory investment, involving both market and manufacturing insights. Master scheduling has traditionally been treated as a material-based planning tool, e.g. in the MRP II (manufacturing resource planning) approach to master scheduling. Capacity is

词汇记忆方法 发表于 2025-3-30 04:19:02

https://doi.org/10.1057/9781137305497 MPS is selected out of 192 alternative MPS determined by using a Cell Loading software in a Cellular Manufacturing environment. The software is used to help implement a Knowledge-Based Finite Schedule Material Requirements Planning (MRP II) in a jewelry manufacturing plant. The knowledge base syste
页: 1 2 3 4 [5] 6
查看完整版本: Titlebook: Beyond Manufacturing Resource Planning (MRP II); Advanced Models and Andreas Drexl,Alf Kimms Book 1998 Springer-Verlag Berlin Heidelberg 1