不容置疑 发表于 2025-3-30 08:32:28

http://reply.papertrans.cn/17/1674/167305/167305_51.png

同步左右 发表于 2025-3-30 16:25:08

http://reply.papertrans.cn/17/1674/167305/167305_52.png

咯咯笑 发表于 2025-3-30 18:46:27

http://reply.papertrans.cn/17/1674/167305/167305_53.png

INTER 发表于 2025-3-31 00:42:02

Analytical and Computational Models for In-Store Shopper Journeysowever, retailing has received very little attention from researchers in terms of developing quantitative models that are used in the rest of the supply chain. This paper proposes analytical and computational models based on queuing theory and discrete-event simulation, respectively, for in-store sh

宽大 发表于 2025-3-31 01:07:56

A Meta-heuristic Approach for Industry 5.0 Assembly Line Balancing and Scheduling with Human-Robot Chuman-robot collaboration (HRC) is substantial. In HRC environments, human and robot operators share the workplace and can perform tasks simultaneously and collaboratively, amplifying work efficiency and operators’ welfare. This research investigates solutions to the assembly line balancing problem

声明 发表于 2025-3-31 07:36:13

Game-Based Design of a Human-Machine Collaboration Monitoring Systemractions. Additionally, effective monitoring of the behavior of both human and machine agents during this collaboration poses significant challenges. The developed game-based process enables the analysis of the behaviours, leading to improved efficiency and collaboration. Indicators such as agent ut

GEM 发表于 2025-3-31 09:58:46

http://reply.papertrans.cn/17/1674/167305/167305_57.png

无瑕疵 发表于 2025-3-31 14:38:48

A Bibliometric Perspective of Integrating Labor Flexibility in Workload ControlWLC) systems presents a critical yet underexplored facet of industrial operation. This research embarks on a comprehensive bibliometric and systematic literature network analysis crossing a decade of studies from 2014 to 2024, uncovering pivotal contributions and identifying prevalent themes in LF a

恫吓 发表于 2025-3-31 19:45:49

https://doi.org/10.1007/978-3-663-02551-1 the model considering the following characteristics of the target ETO production site: (1) The planner has discretion in shortening required processing time; (2) Operation time is limited to day time of weekdays; (3) Overtime works can be accepted if necessary; (4) Some operations of multiple parts

继承人 发表于 2025-3-31 21:52:48

Klimaschutzgesetz und Klimapaket,E) in Industry 5.0. To evaluate the critical factors of success, this research has prioritized these factors using a fuzzy nonlinear approach based on the hierarchical analysis method and pairwise comparison tables based on linguistic variables. The results show that the existence of technical infra
页: 1 2 3 4 5 [6] 7
查看完整版本: Titlebook: Advances in Production Management Systems. Production Management Systems for Volatile, Uncertain, Co; 43rd IFIP WG 5.7 Int Matthias Thürer,