Comprise 发表于 2025-3-25 04:16:36
Hari Mohan Dubey,Manjaree Pandit,Bijaya Ketan PaniPresents research works in the field of artificial intelligence and sustainable computing.Provides original works presented at ICSISCET 2020 held in Gwalior, India.Serves as a reference for researcher带伤害 发表于 2025-3-25 09:10:37
Algorithms for Intelligent Systemshttp://image.papertrans.cn/b/image/162325.jpg太空 发表于 2025-3-25 14:45:14
https://doi.org/10.1007/978-981-16-1220-6ICSISCET 2020; Sustainable Computing; Information Technology; Computational Intelligence; Machine Learni修正案 发表于 2025-3-25 18:37:50
978-981-16-1222-0The Editor(s) (if applicable) and The Author(s), under exclusive license to Springer Nature Singapor助记 发表于 2025-3-25 21:54:07
Control of On-Board Electric Vehicle Charger,f EVs connected to distribution grid may create some problems in terms of over/under-voltage and power quality issues. Moreover, on-board EV charger may support the grid by exchange of active–reactive power with coordinated control. Therefore, this paper presents control architecture for an on-board有害 发表于 2025-3-26 03:10:54
,NSGA-III-Based Time–Cost–Environmental Impact Trade-Off Optimization Model for Construction Projectironmental impact of project is also a key indicator of projects’ success. In view of the increasing air pollution due to execution of numerous construction projects, few studies have been conducted to optimize the time–cost–environmental impact trade-off. Because of the exponential increase in thegastritis 发表于 2025-3-26 06:38:13
http://reply.papertrans.cn/17/1624/162325/162325_27.pngOrdeal 发表于 2025-3-26 10:10:07
,Simulated Annealing-Based Time–Cost Trade-Off Model for Construction Projects, of methods for the development of time–cost trade-off (TCT) models, this paper provides a simulated annealing-based TCT model. A construction activity has several alternatives with different amount of resources, due to which each alternative has different amount of execution time and cost. Many wayslow-wave-sleep 发表于 2025-3-26 13:44:08
,AHP and NSGA-II-Based Time–Cost–Quality Trade-Off Optimization Model for Construction Projects,paper provides a non-dominated sorting genetic algorithm II-based time–cost–quality trade-off optimization model for project scheduling. The study assumes that each activity of project has different alternatives accompanied by different time, cost and impact on entire project quality. The main objecACRID 发表于 2025-3-26 18:01:18
A Wavelet-Based Segmentation Technique for Medical Images,aper describes the wavelet-based segmentation method for segmentation of medical images, particularly X-ray images, to locate any fracture in the bones. Of the images considered in this study, the third level of decomposition of Haar wavelet is found most suitable in terms of statistical image ident