faucet 发表于 2025-3-28 18:12:23
Nitrogen Removal by a Combined Subsurface Vertical Down-Flow and Up-Flow Constructed Wetland Systemstem operated with higher HLR. The removal efficiency for NH.-N and COD was maximum at 10 cm day. (79 and 74% respectively). Nitrification was significant in vertical down-flow bed, denitrification in the up-flow bed at every HLR. The two-stage constructed wetland removed 96–98% of incoming total su符合国情 发表于 2025-3-28 22:43:52
,Constructed Wetland Břehov: Three Years of Monitoring,epublic. The results also indicated that during the warm period (May–October) treatment efficiency for nitrogen and phosphorus was higher than that during cold period of the year (November–April). Removal of organics and suspended solids was not affected by the season. . reached its aboveground biom剧本 发表于 2025-3-28 23:18:52
http://reply.papertrans.cn/103/10209/1020899/1020899_43.png雪崩 发表于 2025-3-29 03:20:07
Factors Affecting the Longevity of Subsurface Horizontal flow Systems Operating as Tertiary Treatmereed beds have deteriorated to the extent that they are close to failing to comply with the regulator’s requirements. Severn Trent Water Ltd. recognised this situation and has committed a budget for a programme of reed bed maintenance. Initially a budget was allocated to refurbish the reed beds in tExpurgate 发表于 2025-3-29 08:15:28
http://reply.papertrans.cn/103/10209/1020899/1020899_45.pngCRAFT 发表于 2025-3-29 13:27:32
http://reply.papertrans.cn/103/10209/1020899/1020899_46.png单调女 发表于 2025-3-29 19:09:10
http://reply.papertrans.cn/103/10209/1020899/1020899_47.png努力赶上 发表于 2025-3-29 19:51:15
http://reply.papertrans.cn/103/10209/1020899/1020899_48.pngfastness 发表于 2025-3-30 01:09:44
http://reply.papertrans.cn/103/10209/1020899/1020899_49.pngengrave 发表于 2025-3-30 06:54:39
http://reply.papertrans.cn/103/10209/1020899/1020899_50.png