他一致 发表于 2025-3-23 12:15:38
http://reply.papertrans.cn/99/9824/982364/982364_11.png–DOX 发表于 2025-3-23 14:26:26
http://reply.papertrans.cn/99/9824/982364/982364_12.png严重伤害 发表于 2025-3-23 20:58:53
http://reply.papertrans.cn/99/9824/982364/982364_13.pngCertainty 发表于 2025-3-23 22:51:28
http://reply.papertrans.cn/99/9824/982364/982364_14.png争论 发表于 2025-3-24 03:46:32
http://reply.papertrans.cn/99/9824/982364/982364_15.pngfilial 发表于 2025-3-24 08:26:52
http://reply.papertrans.cn/99/9824/982364/982364_16.png可忽略 发表于 2025-3-24 12:04:44
The Vertical Geodetic Network in Chilewards. At this time, the network is composed of a great number of first order points that are distributed on different leveling lines with reference to the mean sea level, and on different highways and roads along a large extent of the national territory. Also, the present situation of the nationalALIEN 发表于 2025-3-24 17:07:48
Approach to the New Vertical Reference System for Colombiationing System (GPS), the Instituto Geográfico Agustín Codazzi is defining a new vertical reference system. It will be based on the combination of existing leveled heights, gravity information, GPS data and a precise quasigeoid computation. In this way, it will be possible to combine physical and ge护航舰 发表于 2025-3-24 20:56:56
Vertical Control Networks in Indonesiaon the island of Java. Geographic condition and the availability of infrastructures in the country were the main constraints in the development of VCNI to fit the national development program priorities in the first 25-year plan..The VCNI composed by first order vertical control networks (FOVCN) andBAIL 发表于 2025-3-25 00:04:05
Current Status of Vertical Control Network in Peninsular Malaysia and Plans for Adjustmenttive steps in early 1987 to prepare for a new vertical control for Peninsular Malaysia. The new Precise Levelling Network (PLN) was completed in 1998 with more than 5300 BMs planted. This paper gives an overview on the current status of the new vertical network as well as plans and preparations for