含沙射影 发表于 2025-3-26 23:04:27
http://reply.papertrans.cn/92/9142/914183/914183_31.pngGuaff豪情痛饮 发表于 2025-3-27 04:55:30
,On Effective Use’s Ensuring of High-Voltage Electrical Networks Under Non-full Phase Operational Conditions, maximum permissible overloads of single-phase autotransformers must be provided under non-full phase operational conditions. The diagram of the electrical network with the rated voltage of 750 kV and corresponding results illustrating the proposed approach application are presented.Hemiparesis 发表于 2025-3-27 07:12:21
Research and Practice of Digital Three-Phase Flowmeter for Complex Oil and Gas Occasioner complex conditions, and can meet the needs of flow measurement under high GOR and high water cut in the oilfield, and has the feasibility to widely expand the application in domestic and foreign oil fields.Pageant 发表于 2025-3-27 12:20:37
http://reply.papertrans.cn/92/9142/914183/914183_34.pngmuffler 发表于 2025-3-27 15:30:23
http://reply.papertrans.cn/92/9142/914183/914183_35.png拖网 发表于 2025-3-27 20:29:31
http://reply.papertrans.cn/92/9142/914183/914183_36.png