Affluence 发表于 2025-3-23 11:38:31
http://reply.papertrans.cn/88/8781/878063/878063_11.png诙谐 发表于 2025-3-23 17:19:05
Structuring Bilateral Energy Contract Portfolios in Competitive Marketsn uncertain parameters are spot price, exogenous water inflow to the hydro system and fuel-oil and gas cost. A mean-risk objective function is considered as a composite function of the expected trading profit and the weighted probability of reaching a given profit target. The expected profit is giveLegend 发表于 2025-3-23 20:10:31
Tactical Portfolio Planning in the Natural Gas Supply Chain of production fields. The tool takes a global view of the supply chain, including elements such as production fields, booking of transportation capacity, bilateral contracts and spot markets. The bilateral contracts are typically take-or-pay contracts where the buyer’s nomination and the prices areFLIP 发表于 2025-3-24 01:50:13
Stochastic Equilibrium Models for Generation Capacity Expansionappeal at the inception of restructuring even though they still offer a lot of possibilities and are in many respect irreplaceable provided they are adapted to the new environment. We introduce stochastic equilibrium versions of these models that we believe provide a relevant context for looking at记忆法 发表于 2025-3-24 05:09:32
http://reply.papertrans.cn/88/8781/878063/878063_15.pngvisceral-fat 发表于 2025-3-24 07:17:58
http://reply.papertrans.cn/88/8781/878063/878063_16.pngMicroaneurysm 发表于 2025-3-24 11:30:09
http://reply.papertrans.cn/88/8781/878063/878063_17.pngmucous-membrane 发表于 2025-3-24 16:47:42
Performance Enhancements for Defined Benefit Pension Plansduration-enhancing overlay rule improves performance during economic contractions. The methodology is evaluated via historical backtests and a highly flexible, forward-looking financial planning tool.Optimum 发表于 2025-3-24 21:21:32
http://reply.papertrans.cn/88/8781/878063/878063_19.pngsyncope 发表于 2025-3-25 01:02:03
A Decision Support Model for Weekly Operation of Hydrothermal Systems by Stochastic Nonlinear Optimi the reservoir volume depends nonlinearly on the headwater elevation, leading to a large-scale stochastic nonlinear optimization problem, whose formulation and solution are detailed in the case study. An analysis of exhaustive alternatives of computer implementation is also discussed.