食草
发表于 2025-3-23 12:38:13
http://reply.papertrans.cn/88/8781/878026/878026_11.png
不可侵犯
发表于 2025-3-23 14:01:22
http://reply.papertrans.cn/88/8781/878026/878026_12.png
Recess
发表于 2025-3-23 21:01:03
http://reply.papertrans.cn/88/8781/878026/878026_13.png
啪心儿跳动
发表于 2025-3-23 23:43:36
http://reply.papertrans.cn/88/8781/878026/878026_14.png
Gossamer
发表于 2025-3-24 05:05:17
http://reply.papertrans.cn/88/8781/878026/878026_15.png
FRAX-tool
发表于 2025-3-24 08:32:24
http://reply.papertrans.cn/88/8781/878026/878026_16.png
颠簸下上
发表于 2025-3-24 12:18:28
Renewal Processes and Their Computational Aspects,evertheless, no articles reporting those results Fin a systematic way have appeared in the literature. In this chapter, we survey the computational aspects of the renewal function based on the most recent results obtained up to the present stage. A comprehensive bibliography in this research area is also provided.
鄙视
发表于 2025-3-24 18:23:07
http://reply.papertrans.cn/88/8781/878026/878026_18.png
Fibrinogen
发表于 2025-3-24 19:06:48
Imperfect Preventive Maintenance Models,mulative damage model where the total damage .. reduces to ..Y. at the k-th pm. The expected cost is obtained, and optimal policies which minimize it are discussed. To make it possible to understand these results easily and correctly, some numerical examples of each model are given.
EXULT
发表于 2025-3-24 23:22:15
A Review of Delay Time Analysis for Modelling Plant Maintenance,ve estimation techniques are outlined. Case sketches present practical experience in using the DT concept to model actual plant, to assess the benefits obtained, and to validate modelling and parameter assessment. References are given throughout to related work as well as to future developments.