The Changing Character of the Public Inquiry,th the rise of the ‘big’ inquiry. We identify four central, interrelated, but mutually discrete elements of the major public inquiry, and suggest that while the Sizewell B Inquiry displayed all of these in varying degrees, its most notable feature was a tendency towards an . style. The Sizewell B Inquiry may prove to be a special case.

白杨 发表于 2025-3-25 08:03:04

http://reply.papertrans.cn/87/8682/868165/868165_22.png

没花的是打扰 发表于 2025-3-25 15:40:25

Safety and Public Trust,tement of Case and Proofs of Evidence. The totality of the safety case ran to 26 volumes and over three hundred supporting documents. Yet these were for only one stage, the pre-construction safety review, of what is essentially a continuing and evolving process (CEGB, P.10, 3).

丰满中国 发表于 2025-3-25 16:59:18

Uranium, Plutonium and Decommissioning,oubtedly used the Inquiry as a political forum. They also exploited the investigatory nature of the Inquiry to extract information and concessions from the Board. The pattern of evidence is illustrated in Figure 8.2.

纬线 发表于 2025-3-25 20:07:54

The Suffolk Dimension,iry. At stake . was its ability to command confidence amongst. local people that it could handle the Board’s application with a thoroughness and an impartiality that would enable them to accept its findings. Hence, in part, the Inspector’s remarks.

APNEA 发表于 2025-3-26 02:14:10

Setting the Scene for the Sizewell B PWR, engineering project of awesome complexity, the successful construc-tion of which set the pattern for British electricity policy for the life of at least two Parliaments. The Sizewell B decision was therefore an intensely political matter, the more so because of the post-Chernobyl atmosphere in whic

Frequency-Range 发表于 2025-3-26 07:14:18

http://reply.papertrans.cn/87/8682/868165/868165_27.png

冷淡一切 发表于 2025-3-26 12:10:33

The Procedures and Calendar of the Sizewell B Inquiry,ricity Generating Stations and Overhead Lines (Inquiries Procedure) Rules 1981 (the 1981 Rules), were promulgated as the Inquiry itself was being established. These rules, like all inquiries procedure rules, are drafted to provide only a broad outline. The most important rule is Rule 8(1) which stat

armistice 发表于 2025-3-26 15:02:14

http://reply.papertrans.cn/87/8682/868165/868165_29.png

大喘气 发表于 2025-3-26 17:23:49

http://reply.papertrans.cn/87/8682/868165/868165_30.png
页: 1 2 [3] 4 5 6
查看完整版本: Titlebook: Sizewell B; An Anatomy of Inquir Timothy O’Riordan,Ray Kemp,Michael Purdue Book 1988 Palgrave Macmillan, a division of Macmillan Publishers