APEX 发表于 2025-3-25 05:55:16

Adam Jakubowskielected from the two classes, are evaluated against their work-conserving counterparts. It is demonstrated that non-work-conserving policies can be particularly useful when the workload or the system behavior are irregular. Variability in the workload behavior including bursty arrivals, a high coeff

原始 发表于 2025-3-25 10:44:48

http://reply.papertrans.cn/87/8650/864967/864967_22.png

哎呦 发表于 2025-3-25 12:05:15

Christian Léonard,Jean-Claude Zambrini not affected by job size characteristics, (2) certain job size characteristics affected performance of priority scheduling significantly. The analysis of the results showed that the LJF algorithm, which dispatched the largest job first, would perfectly pack jobs to idle processors at high load, whe

Aboveboard 发表于 2025-3-25 16:25:19

József Lőrincziwith merely 20 estimate values, hindering the scheduler’s ability to backfill..We conclude that researchers must stop using multiples of runtimes as estimates, or else their results would likely be invalid. We develop (and propose to use) a realistic model that preserves the estimates’ modality and

支架 发表于 2025-3-25 20:02:49

Anatoliy Malyarenkowith merely 20 estimate values, hindering the scheduler’s ability to backfill..We conclude that researchers must stop using multiples of runtimes as estimates, or else their results would likely be invalid. We develop (and propose to use) a realistic model that preserves the estimates’ modality and

infringe 发表于 2025-3-26 00:28:12

http://reply.papertrans.cn/87/8650/864967/864967_26.png

钢笔尖 发表于 2025-3-26 06:03:06

http://reply.papertrans.cn/87/8650/864967/864967_27.png

synovitis 发表于 2025-3-26 08:44:16

Karl-Theodor Sturm scheduling can work across different administrative domains, across different local schedulers (i.e., PBS and Sun Grid Engine), and across different programming models (i.e., Pthreads, MPI, and sequential). We also describe a new metaqueue system to manage jobs with explicit workflow dependencies.

改良 发表于 2025-3-26 14:08:37

Yimin Xiaoperformed for a range of ω values with both user-estimated run times and actual run times using workload data from two parallel systems, a Cray T3E and an SGI Origin 3800. For these workloads, overall average job wait time typically decreases as ω increases and use of user-estimated run times is sup

落叶剂 发表于 2025-3-26 20:24:23

http://reply.papertrans.cn/87/8650/864967/864967_30.png
页: 1 2 [3] 4 5 6
查看完整版本: Titlebook: Seminar on Stochastic Analysis, Random Fields and Applications VI; Centro Stefano Frans Robert Dalang,Marco Dozzi,Francesco Russo Conferenc