情感 发表于 2025-3-25 07:00:35
“Get Out of My Wind”urbulent wind farm airflow in very large offshore wind farms through flow measurements and high-resolution simulations, to simulate the impacts on the turbines more accurately, and to develop engineering models so that the planning and operation of offshore wind farms can be improved.Contracture 发表于 2025-3-25 11:34:58
http://reply.papertrans.cn/87/8630/862951/862951_22.pngquiet-sleep 发表于 2025-3-25 15:12:19
Different than Previously Assumedble air stratification it is now possible to take the influence of the variable surface roughness of the sea, in other words with varying wave lengths and heights, into account in model calculations in the form of a resistance coefficient.FLIC 发表于 2025-3-25 19:41:06
Metamorphoses of an Offshore Wind Farmosting hundreds of millions is uncertain territory for investors, banks and insurance companies. A project planning company initially planned the Borkum West wind farm in the late 1990s. The building permit was then acquired by the Offshore Wind Energy Foundation, which in turn leased the rights of难理解 发表于 2025-3-25 20:41:43
Who, What, When, Why and Above All – Whereto? Responsible for the coordination of the research activities was Fraunhofer IWES. The most important task of this project was to create a mutually agreed cooperation structure for all those involved in the project. This included the organisational and scientific networking of all research partners fhappiness 发表于 2025-3-26 03:32:27
A Thousand Sensors, from the Blade Tip to the Bottom of the Seaual sub-projects. It thus provides the necessary service facility for all the institutes, agencies and firms involved in the overall project. The Federal Maritime and Hydrographic Agency (BSH) manages and coordinates the installation of the measuring instruments and the maintenance and support of thOpponent 发表于 2025-3-26 05:26:45
A Firm Hold in Rough Seas-scale tripod foundations were tested in a large wave channel, while the welding seams of the lattice-style jacket foundations were examined for fatigue resistance. A measuring system was developed for the grout filling of the cavity between the pile in the seabed and the transition piece that can m净礼 发表于 2025-3-26 12:16:45
Life Goes on models, and likewise it is necessary to analyse the influence of swell, scour and marine growth on the fatigue loads of the supporting structures and the consequences of material loss on the service life. The numerical modelling of the tube node connections of jacket supporting structures pose a grMettle 发表于 2025-3-26 14:36:43
http://reply.papertrans.cn/87/8630/862951/862951_29.pngCoronation 发表于 2025-3-26 20:18:31
Uncharted Territory on the Seabede RAVE project . was a new type of foundation, the Tripile, used in the BARD Offshore 1 (80 × 5 MW) wind farm. Like a tripod, three piles are driven into the seabed, but rise several metres above the surface of the water, where they are connected with one another by a square transition piece. The ai