EVADE 发表于 2025-3-23 09:41:18
Turbulence Characteristics in a Rough Open Channel Under Unsteady Flow Conditions,d repeatedly through the rectangular flume with a fixed rough bed. The dense rough mat is used as a rough bed which replica of a dense grass bed. The flow patterns are investigated at both lateral and longitudinal positions over three different cross-sections by using a micro Pitot tube and AcousticConflagration 发表于 2025-3-23 16:47:38
Optimisation of Hydraulic Design of Uri-II Dam Spillway, Jammu and Kashmir,Uri Tehsil of Baramulla District of Jammu and Kashmir. It has a power generation capacity of 240 MW (4 units of 60 MW each) utilising a gross head of about 130 m. The project consists of a 52 m high and 173 m long concrete gravity dam with a 4.27 km long headrace tunnel (8.4 m diameter), a restricte受伤 发表于 2025-3-23 19:24:24
Modification of Spillway Ski Jump Bucket Subjected to Higher Tail Water Levels, optimization of ski jump bucket subjected to higher tail water levels can be done by studying its performance for various discharge conditions and making necessary modifications for getting clear ski jump action, without having hydraulic jump formation or submerged ski action in the bucket region wULCER 发表于 2025-3-23 23:15:27
http://reply.papertrans.cn/84/8309/830874/830874_14.pngMets552 发表于 2025-3-24 03:20:03
http://reply.papertrans.cn/84/8309/830874/830874_15.pngAND 发表于 2025-3-24 07:56:32
http://reply.papertrans.cn/84/8309/830874/830874_16.pngEXTOL 发表于 2025-3-24 12:55:53
http://reply.papertrans.cn/84/8309/830874/830874_17.pngSpina-Bifida 发表于 2025-3-24 15:55:17
http://reply.papertrans.cn/84/8309/830874/830874_18.pngEviction 发表于 2025-3-24 19:48:42
http://reply.papertrans.cn/84/8309/830874/830874_19.png用手捏 发表于 2025-3-24 23:22:12
http://reply.papertrans.cn/84/8309/830874/830874_20.png