accrete 发表于 2025-3-23 11:17:31
http://reply.papertrans.cn/83/8278/827710/827710_11.png游行 发表于 2025-3-23 15:55:46
http://reply.papertrans.cn/83/8278/827710/827710_12.pngassail 发表于 2025-3-23 19:48:18
Book 2020including job unavailability, arrival of new jobs, and machine breakdown. The occurrence of these unexpected disruptions may cause a change in the planned schedule, which may render the originally feasible schedule infeasible. Rescheduling, which involves adjusting the original schedule to account f等级的上升 发表于 2025-3-23 22:40:12
Rescheduling on Identical Parallel Machines in the Presence of Machine Breakdowns,reakdowns with the objective of minimizing the total completion time. When machine breakdowns occur, the affected jobs need to be rescheduled with a view to not causing excessive schedule disruption with respect to the planned schedule. Schedule disruption is measured by the maximum time deviation o暗指 发表于 2025-3-24 06:11:46
http://reply.papertrans.cn/83/8278/827710/827710_15.pngtendinitis 发表于 2025-3-24 10:08:12
Rescheduling with Controllable Processing Times and Job Rejection in the Presence of New Arrival Jonder the assumption that jobs can be rejected and job processing time is controllable by allocating extra resources. By deterioration effect, we mean that each job’s processing time may be subject to change due to the capability deterioration with machine’s usage, i.e., the actual processing time of内阁 发表于 2025-3-24 13:09:04
Rescheduling with Controllable Processing Times and Preventive Maintenance in the Presence of New Amanufacturing system and reduce the negative impact of new arrival jobs, the strategies of preventive maintenance together with controllable processing times are adopted here, where the machine could be totally recovered after being maintained, i.e., deteriorating effect for jobs arranged after the反省 发表于 2025-3-24 15:26:41
http://reply.papertrans.cn/83/8278/827710/827710_18.png是剥皮 发表于 2025-3-24 21:22:40
http://reply.papertrans.cn/83/8278/827710/827710_19.pngintangibility 发表于 2025-3-25 02:51:58
Rescheduling with Controllable Processing Times and Preventive Maintenance in the Presence of New Ag times are adopted here, where the machine could be totally recovered after being maintained, i.e., deteriorating effect for jobs arranged after the maintenance activity should be restarted from zero.