Osteons 发表于 2025-3-25 04:55:21

http://reply.papertrans.cn/83/8212/821199/821199_21.png

防御 发表于 2025-3-25 10:30:30

http://reply.papertrans.cn/83/8212/821199/821199_22.png

要控制 发表于 2025-3-25 12:49:06

http://reply.papertrans.cn/83/8212/821199/821199_23.png

哑巴 发表于 2025-3-25 19:42:06

http://reply.papertrans.cn/83/8212/821199/821199_24.png

Excise 发表于 2025-3-25 20:27:53

Reducing Service Process Lead-Time Through Inter-Organisational Process Coordinationustrial world, also in the service world, different types of processes exist, requiring different kind of tools and improvement actions. A group of challenging service processes are the so called ‘fluid service processes’ that are considered as uncontrollable, peopledominated, diagnosis-focused, and

意见一致 发表于 2025-3-26 01:12:16

http://reply.papertrans.cn/83/8212/821199/821199_26.png

贝雷帽 发表于 2025-3-26 05:54:11

Forecast of the Traffic and Performance Evaluation of the BMT Container Terminal (Bejaia’s Harbor) full park was of 1241 ETU. While varying the rate of the arrivals (or the batch size), the park full will be saturated for a rate of 1.0368 ships/day (or for a size of 200 ETU). This study was one of the factors that have raised awareness of the EPB to the need of creating a dedicated terminal in t

愤慨点吧 发表于 2025-3-26 11:23:29

http://reply.papertrans.cn/83/8212/821199/821199_28.png

Aggrandize 发表于 2025-3-26 14:40:26

http://reply.papertrans.cn/83/8212/821199/821199_29.png

Needlework 发表于 2025-3-26 16:49:30

An Integrative Approach To Inventory Controlgrated inventory control process when evaluating the appropriateness of inventory control solutions. Results indicate that only simple applications (for instance without forecasts or seasonality) correspond to theoretical cost and service level calculations, while more complex models (forecasts and
页: 1 2 [3] 4 5 6
查看完整版本: Titlebook: Rapid Modelling for Increasing Competitiveness; Tools and Mindset Gerald Reiner Conference proceedings 2009 Springer-Verlag London 2009 Lea