bifurcate 发表于 2025-3-25 06:06:15
http://reply.papertrans.cn/79/7804/780311/780311_21.png画布 发表于 2025-3-25 09:52:45
http://reply.papertrans.cn/79/7804/780311/780311_22.png我说不重要 发表于 2025-3-25 12:21:36
http://reply.papertrans.cn/79/7804/780311/780311_23.png控诉 发表于 2025-3-25 18:46:19
http://reply.papertrans.cn/79/7804/780311/780311_24.pngDeceit 发表于 2025-3-25 21:09:16
Turbine Fatigue Reliability and Life Assessment Using Ultrasonic Inspection: Data Acquisition, Inter The basic structure of an automated ultrasonic inspection system using in turbine surface engineering is briefly introduced. Using the inspection information, a probabilistic model is developed to quantify uncertainties from flaw sizing and model parameters. The uncertainty from flaw sizing is desc提名的名单 发表于 2025-3-26 01:50:53
http://reply.papertrans.cn/79/7804/780311/780311_26.pngimplore 发表于 2025-3-26 08:03:36
http://reply.papertrans.cn/79/7804/780311/780311_27.pngBINGE 发表于 2025-3-26 10:08:44
Age Replacement Models with Random Worksnt of cost rate to find that Policy (1) is the best when preventive replacement costs are the same. However, random replacement and Policy (4) should be better than standard policy when a lower random replacement cost is supposed.Malaise 发表于 2025-3-26 13:36:03
Turbine Fatigue Reliability and Life Assessment Using Ultrasonic Inspection: Data Acquisition, Intere rotor example with realistic ultrasonic inspection data is presented to demonstrate the overall method. Calculations and interpretations of assessment results based on risk recommendations for industrial applications are also discussed.extemporaneous 发表于 2025-3-26 17:27:34
http://reply.papertrans.cn/79/7804/780311/780311_30.png