大小 发表于 2025-3-21 17:19:54
书目名称Optimization in Planning and Operation of Electric Power Systems影响因子(影响力)<br> http://impactfactor.cn/if/?ISSN=BK0703258<br><br> <br><br>书目名称Optimization in Planning and Operation of Electric Power Systems影响因子(影响力)学科排名<br> http://impactfactor.cn/ifr/?ISSN=BK0703258<br><br> <br><br>书目名称Optimization in Planning and Operation of Electric Power Systems网络公开度<br> http://impactfactor.cn/at/?ISSN=BK0703258<br><br> <br><br>书目名称Optimization in Planning and Operation of Electric Power Systems网络公开度学科排名<br> http://impactfactor.cn/atr/?ISSN=BK0703258<br><br> <br><br>书目名称Optimization in Planning and Operation of Electric Power Systems被引频次<br> http://impactfactor.cn/tc/?ISSN=BK0703258<br><br> <br><br>书目名称Optimization in Planning and Operation of Electric Power Systems被引频次学科排名<br> http://impactfactor.cn/tcr/?ISSN=BK0703258<br><br> <br><br>书目名称Optimization in Planning and Operation of Electric Power Systems年度引用<br> http://impactfactor.cn/ii/?ISSN=BK0703258<br><br> <br><br>书目名称Optimization in Planning and Operation of Electric Power Systems年度引用学科排名<br> http://impactfactor.cn/iir/?ISSN=BK0703258<br><br> <br><br>书目名称Optimization in Planning and Operation of Electric Power Systems读者反馈<br> http://impactfactor.cn/5y/?ISSN=BK0703258<br><br> <br><br>书目名称Optimization in Planning and Operation of Electric Power Systems读者反馈学科排名<br> http://impactfactor.cn/5yr/?ISSN=BK0703258<br><br> <br><br>COMMA 发表于 2025-3-21 23:23:55
Dynamic Programming Basic Concepts and Applications in time at which a decision can be made, the decision maker chooses an action from a set of available alternatives, which generally depends on the current state of the system. The objective is to find a sequence of actions (a so-called policy) that minimizes the total cost over the decision making思考 发表于 2025-3-22 04:19:23
Approaches to Stochastic Programming with Application to Electric Power Systemsw technique called importance sampling. We discuss an adaptive importance sampling scheme using an additive approximation function. We show how this technique can be applied to facility expansion planning of electrical power systems. Numerical results of testproblems with numerous stochastic parametErgots 发表于 2025-3-22 06:46:27
http://reply.papertrans.cn/71/7033/703258/703258_4.png付出 发表于 2025-3-22 10:52:36
Experiences with Optimization Packages for Unit Commitmentmpany-owned and jointly-owned plants and long-lasting contracts. These contracts include a lot of different conditions such as price zones and energy constraints and non-convex cost curves. The, complexity of problems in optimization at VEW leads to a three-step hierarchical structure of optimizatio散布 发表于 2025-3-22 13:58:55
Modelling in Hydro-Thermal Optimizationations and by contracted power supply from the national utility (VG). The power system consists of thermal power stations with and without fuel contracts; combined heat and power stations, run-of-river plants, series of run-of-river-plants and water power stations with storage (year, week or day). T捕鲸鱼叉 发表于 2025-3-22 18:45:26
Power System Models, Objectives and Constraints in Optimal Power Flow Calculationser system state online with repect to various objectives. Typical objectives are minimization of the total generation cost, minimization of the total (or regional) active power network losses, maximization of the degree of security of a network or even a combination of some of them. The achievement我要沮丧 发表于 2025-3-22 21:36:22
Use of Linear and Quadratic Programming Techniques in Exploiting the Nonlinear Features of the Optim the nodal power specifications and to the formulation of the objective function. Since there are many inequality constraints there is a strong tendency to linearize the problem and to apply LP and QP-techniques in order to achieve an efficient solution process. Any linearization, however, will incr公猪 发表于 2025-3-23 01:38:46
http://reply.papertrans.cn/71/7033/703258/703258_9.pngBUCK 发表于 2025-3-23 08:26:13
Cost/Benefits Analysis of the Optimal Power Flowpecially during these difficult financial times. An example is presented of an accurate simulation of the cost savings obtained by the OPF for a large utility. The optimization problem that was originally investigated was restricted to the minimization of production cost while eliminating thermal ov