LOPE
发表于 2025-3-26 22:58:36
The CIM-OSA Modelling Levels,ication Modelling Level) and system implementation (Implementation Description Modelling Level). To provide decision criteria, user inputs have to be provided at each CIM system design stage (the 3 Modelling Levels).
生气地
发表于 2025-3-27 04:09:18
CIM-OSA Business Process Design and Execution,Time Support (IEE/IIS) is carried out with continuous relation to the implemented system. This means, the CIM-OSA Creation Process from requirements into system description is an on-going process throughout the whole Business Process design and maintenance.
赞美者
发表于 2025-3-27 06:27:46
http://reply.papertrans.cn/71/7019/701882/701882_33.png
Neutral-Spine
发表于 2025-3-27 12:30:42
http://reply.papertrans.cn/71/7019/701882/701882_34.png
变白
发表于 2025-3-27 14:17:07
8楼
脾气暴躁的人
发表于 2025-3-27 19:25:01
8楼
维持
发表于 2025-3-27 23:37:46
9楼
透明
发表于 2025-3-28 03:21:48
9楼
含水层
发表于 2025-3-28 08:46:34
9楼
ARM
发表于 2025-3-28 12:01:33
9楼