反省
发表于 2025-3-27 00:48:59
Offshore Risk Assessment vol 2.978-1-4471-5213-2Series ISSN 1614-7839 Series E-ISSN 2196-999X
骄傲
发表于 2025-3-27 03:41:31
Approach to Risk Based DesignChallenges for risk based design are introduced, followed by regulatory requirements. The use of risk analysis in risk based design is discussed for topside systems, structural and passive systems, as well as a brief reference to Safety Integrity Levels.
deface
发表于 2025-3-27 08:46:45
http://reply.papertrans.cn/71/7008/700733/700733_33.png
休闲
发表于 2025-3-27 11:05:53
http://reply.papertrans.cn/71/7008/700733/700733_34.png
Entrancing
发表于 2025-3-27 15:03:07
http://reply.papertrans.cn/71/7008/700733/700733_35.png
纠缠,缠绕
发表于 2025-3-27 18:42:07
http://reply.papertrans.cn/71/7008/700733/700733_36.png
膝盖
发表于 2025-3-27 22:55:41
http://reply.papertrans.cn/71/7008/700733/700733_37.png
PACK
发表于 2025-3-28 05:47:30
http://reply.papertrans.cn/71/7008/700733/700733_38.png
可转变
发表于 2025-3-28 09:06:29
http://reply.papertrans.cn/71/7008/700733/700733_39.png
治愈
发表于 2025-3-28 13:45:12
Use of Risk Analysis During the Operations Phase operations phase, it was conducted in a way corresponding to use in the design phase, without reflecting the vast differences between design and operation from a HES (or strictly speaking major hazard risk) management point of view. The use of QRA in the operations phase has increased in the last t