休耕地 发表于 2025-3-21 19:31:57

书目名称Lot-Sizing and Scheduling for Flexible Flow Lines影响因子(影响力)<br>        http://impactfactor.cn/if/?ISSN=BK0588682<br><br>        <br><br>书目名称Lot-Sizing and Scheduling for Flexible Flow Lines影响因子(影响力)学科排名<br>        http://impactfactor.cn/ifr/?ISSN=BK0588682<br><br>        <br><br>书目名称Lot-Sizing and Scheduling for Flexible Flow Lines网络公开度<br>        http://impactfactor.cn/at/?ISSN=BK0588682<br><br>        <br><br>书目名称Lot-Sizing and Scheduling for Flexible Flow Lines网络公开度学科排名<br>        http://impactfactor.cn/atr/?ISSN=BK0588682<br><br>        <br><br>书目名称Lot-Sizing and Scheduling for Flexible Flow Lines被引频次<br>        http://impactfactor.cn/tc/?ISSN=BK0588682<br><br>        <br><br>书目名称Lot-Sizing and Scheduling for Flexible Flow Lines被引频次学科排名<br>        http://impactfactor.cn/tcr/?ISSN=BK0588682<br><br>        <br><br>书目名称Lot-Sizing and Scheduling for Flexible Flow Lines年度引用<br>        http://impactfactor.cn/ii/?ISSN=BK0588682<br><br>        <br><br>书目名称Lot-Sizing and Scheduling for Flexible Flow Lines年度引用学科排名<br>        http://impactfactor.cn/iir/?ISSN=BK0588682<br><br>        <br><br>书目名称Lot-Sizing and Scheduling for Flexible Flow Lines读者反馈<br>        http://impactfactor.cn/5y/?ISSN=BK0588682<br><br>        <br><br>书目名称Lot-Sizing and Scheduling for Flexible Flow Lines读者反馈学科排名<br>        http://impactfactor.cn/5yr/?ISSN=BK0588682<br><br>        <br><br>

WATER 发表于 2025-3-21 21:17:09

Lack of Solution Procedures in the Literature,Lee et al. (1997)—called ‘A genetic algorithm-based approach to flexible flow-line scheduling with variable lot sizes’—neither covers parallel machines (the authors do not define their understanding of a ‘flexible flow line’), nor does it solve lot-sizing decisions in the sense of this study. Using

AMBI 发表于 2025-3-22 00:32:25

http://reply.papertrans.cn/59/5887/588682/588682_3.png

strdulate 发表于 2025-3-22 06:14:54

Phase III: Product-to-Slot Assignment,roduct families to individual products and solve the associated scheduling problem: For each product family and production stage, we have a number of product family unit production start- and end-times and associated machines. The problem is to assign a product unit to each of those product family s

悦耳 发表于 2025-3-22 11:29:35

An Application in the Semiconductor Industry,s—as opposed to memory chips. Logic chips perform several logical operations and are embedded in a vast number of applications, such as mobile phones, washing machines or music-players. With the upcoming trend of embedded computing, logic chips will become even more widespread.

Explosive 发表于 2025-3-22 13:58:12

http://reply.papertrans.cn/59/5887/588682/588682_6.png

幼稚 发表于 2025-3-22 19:47:36

http://reply.papertrans.cn/59/5887/588682/588682_7.png

Intractable 发表于 2025-3-22 23:17:12

Phase III: Product-to-Slot Assignment,product family unit production start- and end-times and associated machines. The problem is to assign a product unit to each of those product family slots. In other words, we have to label all the existing product family machine/time slots with a product name.

BET 发表于 2025-3-23 04:40:52

http://reply.papertrans.cn/59/5887/588682/588682_9.png

斜谷 发表于 2025-3-23 07:21:11

http://reply.papertrans.cn/59/5887/588682/588682_10.png
页: [1] 2 3 4 5
查看完整版本: Titlebook: Lot-Sizing and Scheduling for Flexible Flow Lines; Daniel Quadt Book 2004 Springer-Verlag Berlin Heidelberg 2004 Flexible Flow Lines.Lot-S