辩论 发表于 2025-3-23 11:23:55

Just-in-time concept in manufacturing and computer systems,The scheduling problems presented in this book follow from two different application areas: production and computer engineering. The common feature of the considered problems is the fact that it is crucial for the control system to observe the due dates.

BLA 发表于 2025-3-23 17:40:04

Individual due dates,In this chapter we consider the just-in-time scheduling problems, where each task has a distinct due date. The due dates may be either problem parameters or decision variables.

剥皮 发表于 2025-3-23 18:46:34

http://reply.papertrans.cn/51/5018/501722/501722_13.png

CEDE 发表于 2025-3-24 01:07:49

International Series in Operations Research & Management Sciencehttp://image.papertrans.cn/j/image/501722.jpg

escalate 发表于 2025-3-24 03:43:10

https://doi.org/10.1007/978-0-387-71718-0Management; Manufacturing; Manufacturing System; Operations Research; algorithms; just-in-time; linear opt

Accomplish 发表于 2025-3-24 09:47:43

Methodological background,pportionment, developed by Balinski and Young. This theory originated from the problem of finding a fair representation of states in the US House of Representatives. Some methods of apportionment may be also used to solve scheduling problems, especially schedule balancing problems. We present these applications in Chapter 5.

怒目而视 发表于 2025-3-24 13:41:15

http://reply.papertrans.cn/51/5018/501722/501722_17.png

Prophylaxis 发表于 2025-3-24 16:47:18

0884-8289 at led to the field of Supply Chain Management.As the field .Just-in-Time Scheduling: Models and Algorithms for Real Time Operating Systems is the first expository treatment surveying the theoretical work on computer systems models and algorithms utilized in just-in-time scheduling. With the impact

callous 发表于 2025-3-24 21:12:41

Algorithms for schedule balancing,bly line allows to determine the number of parts required for assembly, based on the explosion of the bill of material. Thus, the variation of the production volume at the part manufacturing level can be minimized by appropriate scheduling of the finished products on the assembly line.

弯弯曲曲 发表于 2025-3-25 03:10:27

http://reply.papertrans.cn/51/5018/501722/501722_20.png
页: 1 [2] 3 4
查看完整版本: Titlebook: Just-in-Time Scheduling; Models and Algorithm Joanna Józefowska Book 2007 Springer-Verlag US 2007 Management.Manufacturing.Manufacturing Sy