幻影 发表于 2025-3-23 13:03:56

http://reply.papertrans.cn/48/4737/473675/473675_11.png

热情的我 发表于 2025-3-23 16:40:24

http://reply.papertrans.cn/48/4737/473675/473675_12.png

感情脆弱 发表于 2025-3-23 21:24:21

http://reply.papertrans.cn/48/4737/473675/473675_13.png

翅膀拍动 发表于 2025-3-24 01:30:01

Control or Verify Phaseendations are confirmed and institutionalized. This follows because inspection controls are being put in place to confirm that the changes do initially increase quality and that they continue to do so. If the associated project involves new product or service design, this phase also involves confirm

Talkative 发表于 2025-3-24 02:30:21

SQC Case Studiesd study and the wire harness voids study. The objectives of this chapter include: (1) providing direct evidence that the methods are widely used and associated with monetary savings and (2) challenging the reader to identify situations in which specific methods could help..In both case studies, savi

CHURL 发表于 2025-3-24 10:02:09

http://reply.papertrans.cn/48/4737/473675/473675_16.png

难听的声音 发表于 2025-3-24 13:23:26

http://reply.papertrans.cn/48/4737/473675/473675_17.png

爱国者 发表于 2025-3-24 18:34:57

http://reply.papertrans.cn/48/4737/473675/473675_18.png

鲁莽 发表于 2025-3-24 20:21:21

http://reply.papertrans.cn/48/4737/473675/473675_19.png

Neuropeptides 发表于 2025-3-25 01:50:14

http://reply.papertrans.cn/48/4737/473675/473675_20.png
页: 1 [2] 3 4 5 6 7
查看完整版本: Titlebook: Introduction to Engineering Statistics and Lean Sigma; Statistical Quality Theodore T. Allen Textbook 20102nd edition The Editor(s) (if ap