GULP 发表于 2025-4-1 03:21:32
https://doi.org/10.1007/978-981-19-1742-4Power Generation, Transmission and Distribution; Power Electronics and Applications; Renewable Energy是他笨 发表于 2025-4-1 09:36:16
Estimating the Levelized Cost of Electricity of the First Nuclear Power Plant in Bangladesh,ecomes higher than that of coal-based power plants in the country if the plant lifetime is 20 years. This is, however, very unlikely since the average lifetime of a nuclear power plant is much longer. Therefore, Rooppur nuclear power plant is found to be a feasible option from geo-economic point of view.模范 发表于 2025-4-1 11:34:20
http://reply.papertrans.cn/47/4671/467093/467093_63.pngCRUDE 发表于 2025-4-1 18:20:42
Design and Analysis of a Photovoltaic P&O-Based MPPT Lead-Acid Battery, a controller is utilized, allowing solar electricity to be used efficiently. In this situation, a boost regulator is in charge of the battery‘s charging mechanism. For the boost converter, PV module, parameter extraction and evaluation MATLAB/Simulink models are utilized for analysis.agitate 发表于 2025-4-1 21:56:48
http://reply.papertrans.cn/47/4671/467093/467093_65.png