与生 发表于 2025-3-21 19:55:40
书目名称Information and Collaboration Models of Integration影响因子(影响力)<br> http://figure.impactfactor.cn/if/?ISSN=BK0465787<br><br> <br><br>书目名称Information and Collaboration Models of Integration影响因子(影响力)学科排名<br> http://figure.impactfactor.cn/ifr/?ISSN=BK0465787<br><br> <br><br>书目名称Information and Collaboration Models of Integration网络公开度<br> http://figure.impactfactor.cn/at/?ISSN=BK0465787<br><br> <br><br>书目名称Information and Collaboration Models of Integration网络公开度学科排名<br> http://figure.impactfactor.cn/atr/?ISSN=BK0465787<br><br> <br><br>书目名称Information and Collaboration Models of Integration被引频次<br> http://figure.impactfactor.cn/tc/?ISSN=BK0465787<br><br> <br><br>书目名称Information and Collaboration Models of Integration被引频次学科排名<br> http://figure.impactfactor.cn/tcr/?ISSN=BK0465787<br><br> <br><br>书目名称Information and Collaboration Models of Integration年度引用<br> http://figure.impactfactor.cn/ii/?ISSN=BK0465787<br><br> <br><br>书目名称Information and Collaboration Models of Integration年度引用学科排名<br> http://figure.impactfactor.cn/iir/?ISSN=BK0465787<br><br> <br><br>书目名称Information and Collaboration Models of Integration读者反馈<br> http://figure.impactfactor.cn/5y/?ISSN=BK0465787<br><br> <br><br>书目名称Information and Collaboration Models of Integration读者反馈学科排名<br> http://figure.impactfactor.cn/5yr/?ISSN=BK0465787<br><br> <br><br>Adulate 发表于 2025-3-21 23:32:58
http://reply.papertrans.cn/47/4658/465787/465787_2.pngarterioles 发表于 2025-3-22 03:59:39
http://reply.papertrans.cn/47/4658/465787/465787_3.png过去分词 发表于 2025-3-22 05:17:07
Planning and Control of Concurrent Engineering Activities Under Uncertaintyf lead time and life cycle engineering. Shortening of lead time can be done by choosing an uncertainty level and using an iterative algorithm to determine optimal concurrency. Cost uncertainty can be included by adding contingency. Cost and time uncertainty in a project can be catered for by providi少量 发表于 2025-3-22 09:55:49
http://reply.papertrans.cn/47/4658/465787/465787_5.pngAffirm 发表于 2025-3-22 15:08:14
Scheduling Design Activitiesurrent engineering approach is to minimize the total design time without violating any of the constraints. A limited number of available resources constrain the simultaneous execution of design activities. The execution of succeeding design activities depends on the available information provided byMast-Cell 发表于 2025-3-22 17:40:07
Life-Cycle Support of a New Generation of Open and Highly Configurable Manufacturing Control Systemseneration software products have a number of shortcomings which severely constrain solutions and prevent them from meeting certain of the requirements identified. Based on a description of those constraints the paper explains the rationalle for a new integration methodology which can support key aspexhibit 发表于 2025-3-22 21:39:46
Designing Collaborative Systems to Support Reactive Problem-Solving in Manufacturinga case study to understand the information requirements for reactive problem-solving in manufacturing. We focus on the communication mechanisms, decision-making processes, and implementation issues for problems that arise due to materials shortage in electronics assembly. We then describe a conceptu无弹性 发表于 2025-3-23 04:01:55
http://reply.papertrans.cn/47/4658/465787/465787_9.pngConfirm 发表于 2025-3-23 08:44:56
Enterprise Integration: A Tool’s perspectivee global marketplace, manufacturing companies must integrate these new technologies into their factories. In addition, they must integrate the planning, control, and data management methodologies needed to make effective use of these technologies. This paper provides an overview of recent approaches