BILIO
发表于 2025-3-28 17:46:13
http://reply.papertrans.cn/47/4657/465656/465656_41.png
臆断
发表于 2025-3-28 21:32:47
http://reply.papertrans.cn/47/4657/465656/465656_42.png
能得到
发表于 2025-3-29 00:33:27
A Holonic Approach to Dynamic Manufacturing Schedulingach to manufacturing scheduling, which in opposite to traditional approaches, distributes the scheduling functions over several entities, combining their calculation power and local optimization. In this scheduling and control approach, the scheduling mechanism evolves dynamically to combine optimiz
Figate
发表于 2025-3-29 06:08:46
Toward Collaborative Schedulingering that they usually involve multiple, and sometimes conflicting, criteria. Particularly in scheduling which aim is to find the trade off between loading efficiency and delivery accuracy taking into account holding costs, tardiness penalties and expedition charges. Scheduling decisions should be
aesthetician
发表于 2025-3-29 08:20:27
http://reply.papertrans.cn/47/4657/465656/465656_45.png
MAL
发表于 2025-3-29 12:30:55
An Agent-Based Simulation of A Jit Material Handling Systemuring waste by producing the right part in the right place at the right time. We propose to apply JIT principles to material handling in assembly plants. Material Kanbans are introduced as an effective means to control and balance the physical material/part flow in the plant floor. An agent-based si
反对
发表于 2025-3-29 18:28:26
http://reply.papertrans.cn/47/4657/465656/465656_47.png
从属
发表于 2025-3-29 23:44:17
http://reply.papertrans.cn/47/4657/465656/465656_48.png
短程旅游
发表于 2025-3-30 00:01:49
http://reply.papertrans.cn/47/4657/465656/465656_49.png
存在主义
发表于 2025-3-30 05:44:41
http://reply.papertrans.cn/47/4657/465656/465656_50.png