AXIOM 发表于 2025-3-23 12:08:55

978-1-4419-4797-0Springer-Verlag US 1998

猛击 发表于 2025-3-23 16:19:54

Industrial Applications of Combinatorial Optimization978-1-4757-2876-7Series ISSN 1384-6485

衰老 发表于 2025-3-23 20:57:46

http://reply.papertrans.cn/47/4640/463937/463937_13.png

pacific 发表于 2025-3-24 00:38:11

http://reply.papertrans.cn/47/4640/463937/463937_14.png

Amendment 发表于 2025-3-24 04:07:33

Scheduling Jobs with Sequence Dependent Setups on Coupled Lines,, i.e., both lines must be operated simultaneously. A heuristic procedure is developed to find a good schedule which then is used as a starting point for a tabu search. A mixed integer programming formulation of the problem is also given. Computational results on real-world problems are presented.

无法破译 发表于 2025-3-24 06:59:10

https://doi.org/10.1007/978-1-4757-2876-7Analysis; Manufacturing; algorithm; algorithms; combinatorial optimization; communication; electronics; ope

FORGO 发表于 2025-3-24 10:41:49

Moving Toward an Integrated Decision Support System for Manpower Planning at Continental Airlines: tions of this model has demonstrated over $6 million in annual savings for Continental Airlines due to better pilot training assignments alone. Based on a conservative estimate, an integrated DSS will save Continental over $10 million annually.

Original 发表于 2025-3-24 17:08:23

The Development, Implementation and use of a Package to Facilitate Planning and Production Schedulify the current month’s demand or demand in the future. It should be noted that the making and packing machines cannot make or pack all products, only specific subsets. The model is developed on a monthly basis and is then replicated for up to a year ahead, with the individual months joined by the cl

安心地散步 发表于 2025-3-24 22:35:03

Stability Radius of an Optimal Schedule: A Survey and Recent Developments,he largest quantity of independent variations of the processing times of the operations such that this schedule remains optimal. We present formulas for the calculation of the stability radius, when the objective is to minimize mean or maximum flow time. The extreme values of the stability radius ar

学术讨论会 发表于 2025-3-24 23:42:17

http://reply.papertrans.cn/47/4640/463937/463937_20.png
页: 1 [2] 3 4 5 6
查看完整版本: Titlebook: Industrial Applications of Combinatorial Optimization; Gang Yu Book 1998 Springer-Verlag US 1998 Analysis.Manufacturing.algorithm.algorith