OUTRE 发表于 2025-3-30 10:37:56

Transportation of the Anaesthetized and Critically Ill Patient,everal interlinked phases. These include assessment and evaluation, optimization and stabilization, decision making, communication, clinical management of the transferred patient, endorsement to the receiving facility clinical team, and return to base..Critical care transportation has not only seen

改正 发表于 2025-3-30 14:50:50

elligent buildings, which by nature are designed, constructed, installed, operated, and maintained through virtual consortium of enterprises. In other words, typically a number of virtual organizations are involved during the entire life cycle of these products. The involved companies include the eq

蚊子 发表于 2025-3-30 16:55:44

http://reply.papertrans.cn/47/4628/462759/462759_53.png

indenture 发表于 2025-3-30 22:53:08

Y. Hammad,S. Bali,A. Fekielligent buildings, which by nature are designed, constructed, installed, operated, and maintained through virtual consortium of enterprises. In other words, typically a number of virtual organizations are involved during the entire life cycle of these products. The involved companies include the eq

发电机 发表于 2025-3-31 01:01:26

http://reply.papertrans.cn/47/4628/462759/462759_55.png

生意行为 发表于 2025-3-31 08:37:22

Nabil A. Shallik,Lamia Tawfik,Muhammad Firas Alhammad,Cherif Boutabba,Nada N. Shallikelligent buildings, which by nature are designed, constructed, installed, operated, and maintained through virtual consortium of enterprises. In other words, typically a number of virtual organizations are involved during the entire life cycle of these products. The involved companies include the eq
页: 1 2 3 4 5 [6]
查看完整版本: Titlebook: Improving Anesthesia Technical Staff’s Skills; Nabil A. Shallik,Ahmed Ismail,Othman Al Hariri Book 2022 Springer Nature Switzerland AG 202