clarify 发表于 2025-4-1 04:09:36

Pavement Construction,and compacted on the same day as the subgrade is prepared. If the subgrade is cohesive and is prepared during May to September (inclusive) protection should be given if the formation is likely to be exposed for more than 4 days.
页: 1 2 3 4 5 6 [7]
查看完整版本: Titlebook: Ideologien zwischen Lüge und Wahrheitsanspruch; Steffen Greschonig,Christine S. Sing Book 2004 Deutscher Universitäts-Verlag/GWV Fachverla