金哥占卜者 发表于 2025-3-30 08:33:21
Conformity of the Use of Space and Land Use in North Jakarta Administrative City,s showed a change in the pattern of spatial utilization in 2008 until 2018. The land use that showed increase in North Jakarta City was industrial land and warehousing of 9.26%, whereas the most decreasing land use was occupancy/housing of 11.83%. Based on the results of the analysis, the land use tjustify 发表于 2025-3-30 13:13:47
http://reply.papertrans.cn/47/4602/460129/460129_52.png突袭 发表于 2025-3-30 20:07:06
Service Quality Gap Analysis of Water Supply in Urban Areas: Water Supply Company, Bogor Regency,y is carried out through weighting based on the Likert scale, data processing and analysis methods which are carried out through the structuring equation modelling (SEM) method. The results showed some of the service quality aspects which are caused by several factors, start from the water resourcesCamouflage 发表于 2025-3-30 21:55:24
http://reply.papertrans.cn/47/4602/460129/460129_54.pngNICHE 发表于 2025-3-31 04:12:25
Analysis of the Impact of Urban Development on River Water Quality Case Study of the Pesanggrahan Rovisions. The role of the Jakarta City Government in maintaining river water quality is in the function of building and supervising buildings that violate the rules. This refers to the granting of permits and finally to prosecution of parties who violate and play a role in decreasing the quality ofEnrage 发表于 2025-3-31 08:53:22
Spatial Assessment of Micro-hydropower Plant in Subsidized Housing Case: Perumnas Parung Panjang, from the physical aspect of the area, supported by the existence of two rivers that pass through the housing, approved with 88 points of spatial scoring. However, from the social aspect, the community is still declined to apply the micro-hydropower plants, due to the lack of public knowledge about排出 发表于 2025-3-31 12:10:38
Cost-Benefit Analysis of Combined Retaining Walls Construction,BCR) is greater than 1 and the net present value (NPV) is greater than 0. When NPV and BCR are used to determine the CBA, there is an economic validation to further the project if NPV and BCR are equal to 0 that shows the breakeven point (less certain outcome). However, if BCR is less than 0, then tanchor 发表于 2025-3-31 16:23:19
Pesanggrahan River Management in the Recent Times, the Anthropocene Era: A Case Study of Sangga Buabor and value system, as well as responsibility in the pattern of these relations. This research was a qualitative research, in which primary data were obtained through field observations and in-depth interviews and secondary data were from related publicly information. In conclusion, human and non-抗体 发表于 2025-3-31 17:59:53
,Simulation of Damage Due to Alkali–Silica Reaction in a Concrete Model at the Macroscale Level,the macroscale will be studied for varying environmental conditions of temperature and relative humidity using the finite element method. Investigations found that temperature as well as relative humidity influences the latency and characteristic time constants, which indicates that the ASR expansiogrenade 发表于 2025-3-31 21:58:31
Combination of LEM and FEM Analysis for Stability of Concrete Cantilever Retaining Wall,ion of both methods which consist of value of factor of safety (FOS) for sliding, FOS for overturning, FOS for bearing capacity, maximum foundation settlement, maximum surface settlement, maximum deflection, and global stability. This study can help the consultant engineers in producing the comprehe