instulate 发表于 2025-3-23 17:37:12
Water Quality Improvement Using Floating Treatment Wetland for Sustainable Management of Dams and R(COD), Total Suspended Solid (TSS), Total Nitrogen (TN), Total Phosphorus (TP), Magnesium (Mg) and Iron (Fe) indicated the removal efficiency was 97.62% for TSS, 91.3% for BOD, 36.36% for COD, 62.96% for TP, 70.28% for TN, 96.65% for Fe and 45.3% for Mg. The findings from this study indicate the con该得 发表于 2025-3-23 19:35:09
http://reply.papertrans.cn/47/4601/460095/460095_13.pngAffection 发表于 2025-3-23 22:12:23
http://reply.papertrans.cn/47/4601/460095/460095_14.pngBRINK 发表于 2025-3-24 05:51:11
Physical Modelling Study on Sediment Removal of Sungai Habu and Sungai Ringlet, Cameron Highlands,ion structure for sediment removal and total of 23 groynes were constructed. The finding showed that the gross deposition and erosion areas increased as the return period rose. It was also noticed that bed sediment in 100 year ARI was eroded more and further than 1 and 5 year ARI due to local scour音的强弱 发表于 2025-3-24 10:22:12
N. Poomvises,P. Pakdeerod,A. Kongsuk,N. Sintuboon,B. Sawasdipong,M. Khardzir Husain,Z. Z. Harith摇摆 发表于 2025-3-24 12:51:31
Safari Mat Desa,Mohd Kamarul Huda Samion,Ahmad Farhan Hamzah,Ernie Abd Manan,Md. Nasir Md. Nohconcert 发表于 2025-3-24 16:50:32
1614-810X afety and engineering issues with the environment in mind. The topics covered included, but was not limited to, best practices in dam safety, reservoir management, dam health monitoring, risk assessment, emergency management and sustainable dams.978-981-15-1973-4978-981-15-1971-0Series ISSN 1614-810X Series E-ISSN 2198-316X结束 发表于 2025-3-24 19:17:01
omplex uncertainties in a systematic and more complete manner than deterministic analyses alone. There is today a cultural shift in the approach for design and risk reduction in our profession. Reliability and risk-based approaches will assist preparing sustainable engineering recommendations and ma边缘 发表于 2025-3-25 02:33:32
Farah Hanan Binti Tipolhree field trials, and the ELISA project is the most advanced of them. In ELISA, a 5 kilometer section of the motorway A5 in the German Federal State of Hessen is equipped with the eHighway system in both directions. The project is led by the respective road authority Hessen Mobil, and Technische Un不持续就爆 发表于 2025-3-25 05:29:18
http://reply.papertrans.cn/47/4601/460095/460095_21.png