The Slab Design Problem in the Steel Industry,ght for each order using multiples of an order-specific production size range, (2) minimum and maximum sizes for each slab, and (3) feasible assignments of multiple orders to the same slab. We developed a heuristic solution based on matchings and bin packing that a large steel plant uses daily in mill operations.BIDE 发表于 2025-3-25 09:04:33
http://reply.papertrans.cn/43/4220/421998/421998_22.png收到 发表于 2025-3-25 13:48:25
http://reply.papertrans.cn/43/4220/421998/421998_23.png揉杂 发表于 2025-3-25 16:20:28
Decision-Making Systems in Production Scheduling,stem. This decision-making systems perspective enhances our understanding of production scheduling. The chapter presents a systems methodology for improving production scheduling systems and describes techniques that can be used to represent production scheduling systems.遣返回国 发表于 2025-3-25 22:24:57
http://reply.papertrans.cn/43/4220/421998/421998_25.pngSKIFF 发表于 2025-3-26 00:51:55
http://reply.papertrans.cn/43/4220/421998/421998_26.pnginterpose 发表于 2025-3-26 05:00:01
Coordination Issues in Supply Chain Planning and Scheduling, this chapter we first provide an overview of all the different planning activities that can take place in supply chains while considering the existing functionalities that are available in commercial supply chain planning software. As a second step we consider the coordination and integration of th锡箔纸 发表于 2025-3-26 11:25:54
http://reply.papertrans.cn/43/4220/421998/421998_28.pngBROTH 发表于 2025-3-26 13:29:00
http://reply.papertrans.cn/43/4220/421998/421998_29.pngCirrhosis 发表于 2025-3-26 20:28:26
,A Review of Long- and Short-Term Production Scheduling at Lkab’s Kiruna Mine, caving. To aid in its ore mining and processing system, Kiruna has adopted the use of several types of multi-period production scheduling models that have some distinguishing characteristics, for example: (i) specific rules governing the way in which the ore is extracted from the mine; (ii) lack of