Negligible 发表于 2025-3-25 06:49:59

http://reply.papertrans.cn/39/3890/388934/388934_21.png

Infect 发表于 2025-3-25 07:57:23

http://reply.papertrans.cn/39/3890/388934/388934_22.png

enumaerate 发表于 2025-3-25 15:11:29

https://doi.org/10.1007/978-3-658-36756-5tage, process planning and manufacture to the assembly. In process planning, which represents the most important link between development and manufacture, the drawings and parts lists prepared by the design department are converted into machining-orientated instructions in the form of operational charts.

雪白 发表于 2025-3-25 18:57:06

https://doi.org/10.1007/978-3-658-42268-4is very much in the foreground. In the case of factories where the GT-manufacturing system has been successfully introduced, this problem factor has been the subject of special discussion, because it has an important influence on the success of the degree of rationalization.

皱痕 发表于 2025-3-25 23:19:23

Introduction,ns to be made on this subject was put forward by Mitrofanov . With the increasing possibilities of being able to analyse and evaluate the resultant data with the aid of electronic data processing equipment, this method is becoming a practicable solution.

前奏曲 发表于 2025-3-26 02:21:00

http://reply.papertrans.cn/39/3890/388934/388934_26.png

额外的事 发表于 2025-3-26 07:19:43

http://reply.papertrans.cn/39/3890/388934/388934_27.png

expunge 发表于 2025-3-26 12:16:41

Parts Design, most work-intensive activities within the product design field of mechanical engineering. Attempts were therefore made at a very early stage to rationalize this crucial point. For that purpose the following methods are generally known

landfill 发表于 2025-3-26 16:13:08

Process Planning,tage, process planning and manufacture to the assembly. In process planning, which represents the most important link between development and manufacture, the drawings and parts lists prepared by the design department are converted into machining-orientated instructions in the form of operational charts.

傲慢物 发表于 2025-3-26 19:38:42

Wage Structure,is very much in the foreground. In the case of factories where the GT-manufacturing system has been successfully introduced, this problem factor has been the subject of special discussion, because it has an important influence on the success of the degree of rationalization.
页: 1 2 [3] 4 5 6
查看完整版本: Titlebook: ;