Blatant 发表于 2025-3-24 06:53:01
http://reply.papertrans.cn/39/3889/388813/388813_16.png狼群 发表于 2025-3-24 13:42:48
http://reply.papertrans.cn/39/3889/388813/388813_17.pngDungeon 发表于 2025-3-24 14:53:34
https://doi.org/10.1007/978-3-642-60203-0and other geotechnical fields. Substantial amount of time, resource, and energy is required to obtain experimental data like CBR values and other parameters in road sub-base constructions. Application of multivariate regression models can be used in predicting the CBR values, and other properties ofradiograph 发表于 2025-3-24 20:52:11
https://doi.org/10.1007/978-4-431-55588-9l issues because of its alkaline nature, thereby polluting the groundwater and surface water. Crusher dust is also an industrial waste generated from the crusher plant that is rich in silica, which storage is also an environmental issue. Hence, this article outlines the binary blending of red mud an周兴旺 发表于 2025-3-25 00:03:01
Enhancement of Soil Properties by Using Red Mud and Lime,terials, red mud (RM) is one, which is a by-product generated during the invention of alumina (Al.O.) from bauxite using Bayer process. So, to minimize these wastes, it can be used as a construction material. This paper demonstrates the maximum use of solid waste RM for the stabilization and influen适宜 发表于 2025-3-25 05:52:39
Ground Improvement for Open Foundation on Soft Clays Using Stone Columns and PVD Drains for Retainitwo side retaining walls on open foundations and earthfill between the two walls. Due to presence of soft clay below the ramps, allowable bearing capacity was very low, and settlements were high to support the weight of ramps which had a maximum height of 12 m. Hence, it was essential to evaluate thBarter 发表于 2025-3-25 07:30:37
State of the Art on the Extent of Smear Zone and Variation of Permeability During the Installation the installation of prefabricated vertical drains (PVD), the mandrel is pushed with static force until the required installation depth is reached. After reaching the installation depth, the mandrel is withdrawn, and the PVD is held in place by an anchor. This installation and taking out of the mandr宽敞 发表于 2025-3-25 13:35:10
http://reply.papertrans.cn/39/3889/388813/388813_23.pngMAPLE 发表于 2025-3-25 17:06:16
http://reply.papertrans.cn/39/3889/388813/388813_24.png确定方向 发表于 2025-3-25 23:29:56
http://reply.papertrans.cn/39/3889/388813/388813_25.png