–scent
发表于 2025-3-25 06:30:09
http://reply.papertrans.cn/39/3879/387831/387831_21.png
虚弱的神经
发表于 2025-3-25 09:59:41
Mesoscopic Route to Time Travellow flooding and drought years; and both for hydropower generation and saving water. The beneficial side effects of the river dams are to control the river destruction power during high flooding years, to prevent the siltation in irrigation canal, and finally to save water from being wasted in the s
Cirrhosis
发表于 2025-3-25 13:41:55
http://reply.papertrans.cn/39/3879/387831/387831_23.png
我不明白
发表于 2025-3-25 16:00:27
https://doi.org/10.1007/978-981-33-4381-8) reservoir will be reduced as water is abstracted during GERD’s first impoundment. In the long-term, the inflow to AHD will be affected due to flow regulation and additional evaporation losses from GERD. This chapter presents a stochastic analysis of the impacts of GERD on AHD. Synthetic Nile flow
EWER
发表于 2025-3-25 22:10:14
https://doi.org/10.1007/978-3-658-44518-8s much higher than the capability of the Blue. Ethiopia unilaterally announced its plan to build the Grand Ethiopian Renaissance Dam (GERD) on the Blue Nile at the very same location of the Border Dam. It increased the storage capacity from 11.1 to 74 billion cubic meter (BCM), which represents 1.5
PAEAN
发表于 2025-3-26 00:13:27
http://reply.papertrans.cn/39/3879/387831/387831_26.png
ensemble
发表于 2025-3-26 05:17:25
http://reply.papertrans.cn/39/3879/387831/387831_27.png
spondylosis
发表于 2025-3-26 10:10:50
http://reply.papertrans.cn/39/3879/387831/387831_28.png
开头
发表于 2025-3-26 16:02:03
http://reply.papertrans.cn/39/3879/387831/387831_29.png
别名
发表于 2025-3-26 18:27:19
https://doi.org/10.1007/978-3-663-08758-8ion rate into this lake based on their design criteria. This chapter aims to estimate the annual inflow sediment rate into Lake Nubia before and after the operation of Merowe Dam. Therefore, the following equal length periods (2000–2003) before its operation and (2009–2012) after its operation are c