Lament 发表于 2025-3-30 10:14:39
d production that will be needed. In doing so, technology could catalyse greater co-operation in the oil industry: between the resources of the major hydrocarbon holders, and the resourcefulness — if one might call it that 002D of the private industry.Chauvinistic 发表于 2025-3-30 15:00:55
On-line Identification in Closed Loopolian, interdune, flood-plain and crevasse-splay environments and terminated in playa lakes. The distribution and systematic arrangement of environments of deposition migrated subtly across the study area. This is attributed to slight fluctuations in climatic conditions (rainfall and windstrength or direction).Excitotoxin 发表于 2025-3-30 16:38:49
http://reply.papertrans.cn/39/3834/383388/383388_53.pngheterodox 发表于 2025-3-30 22:44:50
The environments of deposition of the Triassic Main Buntsandstein Formation in the P and Q quadrantolian, interdune, flood-plain and crevasse-splay environments and terminated in playa lakes. The distribution and systematic arrangement of environments of deposition migrated subtly across the study area. This is attributed to slight fluctuations in climatic conditions (rainfall and windstrength or direction).避开 发表于 2025-3-31 03:05:33
http://reply.papertrans.cn/39/3834/383388/383388_55.png王得到 发表于 2025-3-31 06:03:52
http://reply.papertrans.cn/39/3834/383388/383388_56.png手势 发表于 2025-3-31 09:31:08
Edward A. Lee,David G. Messerschmitt. The main controlling factors that were responsible for the sedimentological differences across the basin are the evolution of the tectonic elements, the increasingly arid climate and the westward prograding extension of the basin. These distinctive features are retained and enhanced during post-Roneoplasm 发表于 2025-3-31 15:52:50
Kehbuma Langmia,Agnes Lucy Landoclastics ceased during the Middle Triassic. The feeder system was responsible for the deposition of the gas-bearing sheet sandstones of the Volpriehausen, Detfurth and Hardegsen Formations. The importance of the Triassic play is demonstrated by the over 100 × 10. m. Gas Initially In Place (GIIP) thaOUTRE 发表于 2025-3-31 21:35:25
Digital Computer Control Systemsnitially in place); 2) modelling of reservoir architecture; and 3) analysis of productivity improvement by multiple-fraccing technology. The success of the project was confirmed when the MFHW well achieved economic gas production rates (transient) in the order of 2 × 10. m./day at 120 bar drawdown f挑剔小责 发表于 2025-3-31 22:27:40
Digital-Connection-Architektur, reverse faults and sub-vertical shear fractures with cataclastic fill, restricting horizontal inflow, explains the disappointing production rates of the second well. Moreover, continuous borehole break-outs were observed from the log, indicating present-day stress anisotropy. The CBIL data in combi