Ernesto Noronha,Premilla D‘Cruzal of customer requirements of (Huang et al., 2011). The customer requirements were collected and weighted in the first step in chapter .. Through the conceptual design schemes, the customer requirements were considered and embodied in chapter ..

名次后缀 发表于 2025-3-27 03:37:43

http://reply.papertrans.cn/39/3824/382380/382380_32.png

consolidate 发表于 2025-3-27 06:33:27

http://reply.papertrans.cn/39/3824/382380/382380_33.png

观察 发表于 2025-3-27 12:11:30

http://reply.papertrans.cn/39/3824/382380/382380_34.png

雇佣兵 发表于 2025-3-27 16:52:00

http://reply.papertrans.cn/39/3824/382380/382380_35.png

peak-flow 发表于 2025-3-27 19:35:53

http://reply.papertrans.cn/39/3824/382380/382380_36.png

Bother 发表于 2025-3-28 00:07:42

Critical Discussion and Outlook,tunities for further research, thereby performing step ten of the HoQ. In discussion rounds with researchers and experts, we analyzed the results to identify aspects that were not yet considered in the concept because they were not listed in the requirements, but which could become requirements in the future.

PALL 发表于 2025-3-28 05:16:06

Summary,production control that should be flexible, e.g., in terms of available machines, new product variants, and unforeseen events. With the contribution of a reactive scheduling system and the integration concept for existing FMSs, we successfully achieved the determined goals defined by the three research questions.

文件夹 发表于 2025-3-28 06:40:55

https://doi.org/10.1007/978-3-658-39179-9Production Scheduling; Flexible Manufacturing; Machine Learning; Multi-Agent System; Reinforcement Learn

Chronic 发表于 2025-3-28 13:11:42

978-3-658-39178-2The Editor(s) (if applicable) and The Author(s), under exclusive license to Springer Fachmedien Wies
页: 1 2 3 [4] 5
查看完整版本: Titlebook: Generic Multi-Agent Reinforcement Learning Approach for Flexible Job-Shop Scheduling; Schirin Bär Book 2022 The Editor(s) (if applicable)