卧虎藏龙 发表于 2025-3-26 23:36:59
A Finite-Domain Constraint-Based Approach on the Stockyard Planning Problemt (e.g. docks at inland ports), and 3) find a time-/cost-optimized schedule for working steps of 1 and 2. This paper presents a novel constraint-based approach for solving the Stockyard Planning Problem (SPP) by utilizing new abstractions such as time, storage, and potential movements within a stockyard system.我就不公正 发表于 2025-3-27 03:42:35
http://reply.papertrans.cn/35/3434/343303/343303_32.pngencomiast 发表于 2025-3-27 08:23:48
http://reply.papertrans.cn/35/3434/343303/343303_33.pngParadox 发表于 2025-3-27 11:11:52
http://reply.papertrans.cn/35/3434/343303/343303_34.png键琴 发表于 2025-3-27 15:35:46
http://reply.papertrans.cn/35/3434/343303/343303_35.pnginstallment 发表于 2025-3-27 21:42:51
http://reply.papertrans.cn/35/3434/343303/343303_36.png健谈 发表于 2025-3-27 23:15:43
http://reply.papertrans.cn/35/3434/343303/343303_37.pngbarium-study 发表于 2025-3-28 02:52:11
http://reply.papertrans.cn/35/3434/343303/343303_38.png