蹒跚
发表于 2025-3-28 16:52:45
Planning in polynomial time, algorithms for knowledge-based or logic-based planning, our algorithm achieves computational tractability, but at the expense of only applying to a significantly more limited class of problems. Our algorithm is proven correct and complete, and it always returns a minimal plan if there is a plan at
intoxicate
发表于 2025-3-28 22:45:42
http://reply.papertrans.cn/32/3193/319208/319208_42.png
LANCE
发表于 2025-3-29 01:26:59
http://reply.papertrans.cn/32/3193/319208/319208_43.png
corpuscle
发表于 2025-3-29 06:11:55
Integrating inductive learning and simulation in rule-based scheduling, scheduling in a flexible flow system. While the bulk of previous research on dynamic machine scheduling deals with the relative effectiveness of a single scheduling rule, the approach presented in this study provides a mechanism for the state-dependent selection of one from among several rules..We
旋转一周
发表于 2025-3-29 08:58:50
CRONOS-III: Requirements for a knowledge-based scheduling tool covering a broad class of productioncheduler developed by the authors for applications in job-shop production environments. In this paper, after a brief survey of the main features of CRONOS-II, the problem of extending it to deal also with aspects proper of flow-shop production is faced. The requirements for a new generalized version
Wordlist
发表于 2025-3-29 12:14:18
http://reply.papertrans.cn/32/3193/319208/319208_46.png
Obituary
发表于 2025-3-29 16:01:46
http://reply.papertrans.cn/32/3193/319208/319208_47.png
简洁
发表于 2025-3-29 20:52:05
http://reply.papertrans.cn/32/3193/319208/319208_48.png
CODE
发表于 2025-3-30 02:03:09
http://reply.papertrans.cn/32/3193/319208/319208_49.png
过渡时期
发表于 2025-3-30 07:04:07
http://reply.papertrans.cn/32/3193/319208/319208_50.png