填料 发表于 2025-3-28 15:58:10
Financial Appraisal of a Micro-Generation Wind Turbine with a Case Study in Ireland,upply requirement on an agricultural premise. The wind turbine is a 10-kW three-phase synchronous type and is embedded with the national electricity supply. It is anticipated that the energy units supplied by the wind turbine offsets, and reduces, the number of energy units imported from the Nationa条约 发表于 2025-3-28 20:03:18
Post-connection Financial Performance Analysis of a Four-Turbine, 3.5-MW, Wind Farm in Ireland,ower to their local power system has increased. For smaller independent wind developers assessing the feasibility of a large-scale wind farm project is vitally important due to significant risk associated with the investment. This paper presents a longitudinal case study of a 3.5-MW wind farm situatKindle 发表于 2025-3-28 23:36:59
http://reply.papertrans.cn/32/3173/317242/317242_43.pngcanonical 发表于 2025-3-29 06:14:45
http://reply.papertrans.cn/32/3173/317242/317242_44.pngDAUNT 发表于 2025-3-29 08:22:26
Findings,urbine technologies as part of their environmentally friendly initiatives and need to evaluate those decisions. Methods to assess such decisions robustly are recounted. Results from the 10-kW, 300-kW, and 3.5-MW wind turbine initiatives are discussed considering the novel evaluation framework. Wind