Mosaic 发表于 2025-3-23 12:14:40
http://reply.papertrans.cn/32/3114/311326/311326_11.png使害怕 发表于 2025-3-23 14:17:32
Upgrading Sewage Treatment Plants for Higher Performance by Optimising Reject Water Treatment efficiency of the biological nitrogen removal in sewage treatment plants..The composition of the reject water is suitable for the use of new biological processes like nitritation/denitritation..Primary sludge can be successfully used as the carbon source for the denitritation, which can be completeBRINK 发表于 2025-3-23 21:04:45
http://reply.papertrans.cn/32/3114/311326/311326_13.pngGEON 发表于 2025-3-24 00:53:42
1568-1238 ontinual need for upgrading water pollution control facilities and restoring degraded urban waters. Such issues are addressed in this book by focusing on five major topics: (a) Upgrading stormwater management facilities, (b) Retrofitting / upgrading combined sewer overflow (CSO) facilities, (c) Opti榨取 发表于 2025-3-24 05:18:55
https://doi.org/10.1007/978-1-4613-8196-9ter quality goals can be achieved by implementing appropriate process modifications and/or additions and by adopting sensible control strategies, supported by an initial “flexible” design of the facility. Adequate on-line monitoring capabilities are needed in all these cases.BILE 发表于 2025-3-24 09:11:01
Improving Sewage Treatment Plant Performance in Wet Weatherter quality goals can be achieved by implementing appropriate process modifications and/or additions and by adopting sensible control strategies, supported by an initial “flexible” design of the facility. Adequate on-line monitoring capabilities are needed in all these cases.影响 发表于 2025-3-24 11:22:24
http://reply.papertrans.cn/32/3114/311326/311326_17.pngGAVEL 发表于 2025-3-24 17:01:19
http://reply.papertrans.cn/32/3114/311326/311326_18.png果仁 发表于 2025-3-24 20:15:05
http://reply.papertrans.cn/32/3114/311326/311326_19.pngingrate 发表于 2025-3-25 02:10:16
The Kingston Pond: A Case Study of Stormwater Pond Upgradings a priority problem and will not authorize the required funding. Second, care must be taken to make the retrofitted facility as adaptive as possible so that future retrofits are possible if conditions change.