鸣叫
发表于 2025-3-25 07:04:15
http://reply.papertrans.cn/32/3108/310750/310750_21.png
AVERT
发表于 2025-3-25 09:59:09
http://reply.papertrans.cn/32/3108/310750/310750_22.png
Synthesize
发表于 2025-3-25 15:28:11
,Zeichnen für Fortgeschrittene,though testing and developing a product — it has to be built-in from the beginning of the design process and maintained throughout the production process. Just as design commits a large proportion of a product’s costs (see 10), up to 80% of all faults can be traced back to insufficient planning and
insomnia
发表于 2025-3-25 19:47:34
https://doi.org/10.1007/978-3-642-88366-8 the development of size ranges and modular products. It is well known that the majority of costs have been committed when the solution principle has been selected and its embodiment completed. During the production and assembly stages there are relatively few opportunities to reduce costs. It is im
减弱不好
发表于 2025-3-25 20:41:56
http://reply.papertrans.cn/32/3108/310750/310750_25.png
群居男女
发表于 2025-3-26 02:45:30
http://reply.papertrans.cn/32/3108/310750/310750_26.png
多产子
发表于 2025-3-26 07:24:23
http://reply.papertrans.cn/32/3108/310750/310750_27.png
FLAGR
发表于 2025-3-26 10:08:08
http://reply.papertrans.cn/32/3108/310750/310750_28.png
rheumatism
发表于 2025-3-26 15:24:31
Product Planning and Clarifying the Task, most useful in the medium- and long-term planning of products. The senior staff of the design department should therefore maintain close contacts not only with the production department, but also with the product planning department.
BOGUS
发表于 2025-3-26 19:38:03
Design for Quality,ess. Just as design commits a large proportion of a product’s costs (see 10), up to 80% of all faults can be traced back to insufficient planning and design work . Furthermore, up to 60% of all breakdowns that occur within the warranty period are caused by incorrect or incomplete product development.