https://doi.org/10.1007/978-3-642-97416-8 the hill climbing strategy), in any heuristic algorithm, both time efficiency and reliability of convergence can be achieved. Testing was done on 6 standard test systems: 16, 33, 70, 118, 135 and 880 bus systems. The results obtained revealed better network configurations that provided lesser power loss than other reported results.
约会
发表于 2025-3-27 04:33:18
Objektorientierte Programmierungudied. Using a hybrid algorithm, the DNR problem was tested on 6 standard test systems: 16, 33, 70, 118, 135 and 880 bus systems. The results showed that DNR using the IVDI can indeed lead to the improvement of the entire system stability.
场所
发表于 2025-3-27 06:39:37
http://reply.papertrans.cn/31/3086/308504/308504_33.png
含糊
发表于 2025-3-27 10:53:38
Voltage Stability Maximization by Distribution Network Reconfiguration Using a Hybrid Algorithmudied. Using a hybrid algorithm, the DNR problem was tested on 6 standard test systems: 16, 33, 70, 118, 135 and 880 bus systems. The results showed that DNR using the IVDI can indeed lead to the improvement of the entire system stability.
hardheaded
发表于 2025-3-27 17:29:13
http://reply.papertrans.cn/31/3086/308504/308504_35.png
遗留之物
发表于 2025-3-27 19:41:17
http://reply.papertrans.cn/31/3086/308504/308504_36.png
Muffle
发表于 2025-3-28 00:34:29
https://doi.org/10.1007/978-3-642-58985-0followed by an analysis of their combined effect. In order to obtain satisfactory responses in terms of settling time, percentage overshoot and steady state error, three types of compensating schemes were implemented, namely, Proportional Integral Derivative (PID), Fuzzy controller and PI-Fuzzy controller.
许可
发表于 2025-3-28 03:02:18
978-3-319-84837-2The Editor(s) (if applicable) and The Author(s) 2017
序曲
发表于 2025-3-28 08:38:16
Emerging Trends in Electrical, Electronic and Communications Engineering978-3-319-52171-8Series ISSN 1876-1100 Series E-ISSN 1876-1119