推迟 发表于 2025-3-28 18:25:48
http://reply.papertrans.cn/31/3085/308492/308492_41.pngconformity 发表于 2025-3-28 19:58:10
http://reply.papertrans.cn/31/3085/308492/308492_42.pngoutrage 发表于 2025-3-28 23:00:39
The Measurement of Uranium Enrichment,tions of National Earthquake Hazards Reduction Program (NEHRP). Site response has been formulated in terms of amplification factor for peak ground acceleration (PGA). The results show that the soils in Haryana are capable of amplifying earthquake ground motions. Therefore, a site-specific design approach should be adopted for important structures.使乳化 发表于 2025-3-29 07:06:05
Comparison of Different Types of Pylon Shapes on Seismic Behaviour of Cable-Stayed Bridges,Bhuj 2001, Loma Prieta 1989 and El Centro earthquake 1940. The seismic response of bridge at various locations are considered and compared. The study shows that the shape of the pylon has got great influence on the seismic behavior of cable-stayed bridge.Optic-Disk 发表于 2025-3-29 11:08:28
Estimation of Local Site Effect on Earthquake Ground Motions for Sites in the State of Haryana, Indtions of National Earthquake Hazards Reduction Program (NEHRP). Site response has been formulated in terms of amplification factor for peak ground acceleration (PGA). The results show that the soils in Haryana are capable of amplifying earthquake ground motions. Therefore, a site-specific design approach should be adopted for important structures.谦虚的人 发表于 2025-3-29 14:47:00
Shear Strength of Rock Quarry Dust and Sand Mix, of the sample by direct shear test. The quarry dust and sand mix were taken with different dry unit weights like 12.17 kN/m., 16.71 kN/m., and 19.62 kN/m. at different strain rates of 0.25 mm/min, 0.625 mm/min, and 1.25 mm/min, respectively. The internal friction angles were found to increase as th组成 发表于 2025-3-29 16:46:14
Identifying and Analysing Key Factors Associated with Risks in Construction Projects,ly in the construction sector. The categories of risks related to clients, subcontractors, finance, contractors and government were found common. The appropriate management plan for risks in construction should be implemented right from the beginning of the project in order to minimize its impact an绕着哥哥问 发表于 2025-3-29 21:56:29
Stability Analysis of Tied-Arch Bridges Under IRC Loading Condition Using Finite Element Method,oad bridge, consisting of two steel arches using finite element analysis method. Nonlinear static analytical method was used for the analysis by using an FEM software Midas Civil. Validation of software for AASTO LRFD vehicle was done. 3D models of single span 200 m slab tied-arch bridges for differhauteur 发表于 2025-3-30 01:28:55
http://reply.papertrans.cn/31/3085/308492/308492_49.pngSoliloquy 发表于 2025-3-30 04:04:59
Thick Section Casting Specifications and Practices in Singapore,ve a tendency to rise the concrete temperature more rapidly and the peak temperature in mass concrete elements. It is also very challenging for Ready-Mix Concrete (RMC) suppliers to achieve low fresh concrete temperatures on-site with local weather conditions. Therefore, the selection of right RMC s