终止
发表于 2025-3-23 13:27:45
Study on Emergency Handing Scheme of Tangjiashan Barrier Lake,During the rescue action of the Wenchuan earthquake barrier lake on May 12, a number of organizations collected and compiled domestic and international cases of barrier lake emergency handing and analyzed the handing techniques.
ferment
发表于 2025-3-23 15:06:53
https://doi.org/10.1007/978-981-99-1706-8Risk Assessment; Danger-elimination Effectiveness Evaluation; Geological Hazards; Earthquake Induced Ba
Simulate
发表于 2025-3-23 18:47:54
William W. Parson,Clemens Burdally balanced. Retrogressively scouring and lateral erosion are obviously observed in the channel during the 4-day discharge process. The side slopes of the channel underwent a process of stability-creep-stability.
locus-ceruleus
发表于 2025-3-24 00:26:25
http://reply.papertrans.cn/31/3082/308116/308116_14.png
detach
发表于 2025-3-24 05:39:14
http://reply.papertrans.cn/31/3082/308116/308116_15.png
干旱
发表于 2025-3-24 07:22:55
http://reply.papertrans.cn/31/3082/308116/308116_16.png
忍受
发表于 2025-3-24 11:29:16
http://reply.papertrans.cn/31/3082/308116/308116_17.png
landmark
发表于 2025-3-24 17:30:06
https://doi.org/10.1007/978-3-662-08801-2ntial impact of secondary disasters induced by the upper Malingyan ancient landslide, it is of great necessity to conduct analysis on the flood evolution of the Tangjiashan barrier lake dam-break, so as to provide scientific basis for the barrier lake emergency handling engineering design scheme and
细微差别
发表于 2025-3-24 21:26:51
http://reply.papertrans.cn/31/3082/308116/308116_19.png
有花
发表于 2025-3-25 00:16:53
http://reply.papertrans.cn/31/3082/308116/308116_20.png