Itinerant 发表于 2025-3-23 10:12:21
Past and Present,Tap-changer with the ability to change taps while power is on called under-load tap-changer. If a tap-changer is built as such that its fixing requires its being disconnected from the power line, the tap-changer is called no-load tap-changer.倔强不能 发表于 2025-3-23 16:15:02
http://reply.papertrans.cn/31/3065/306436/306436_12.png饶舌的人 发表于 2025-3-23 19:39:30
Practical Implementation and Experimental Results,It is noted that HSIHV is implemented at the voltage edges and HSIHV at the current edges. Block HSO has no definite routine but is implemented at appropriate times according to HSIHV programming and AD (consisting of ADV and ADC) is implemented after each A/D conversion.音的强弱 发表于 2025-3-24 00:34:52
http://reply.papertrans.cn/31/3065/306436/306436_14.pngthalamus 发表于 2025-3-24 06:19:42
Design of Controller of Full-Electronic Tap-Changer for Output Voltage Regulation,谷类 发表于 2025-3-24 07:28:35
http://reply.papertrans.cn/31/3065/306436/306436_16.png江湖骗子 发表于 2025-3-24 11:50:35
http://reply.papertrans.cn/31/3065/306436/306436_17.png荨麻 发表于 2025-3-24 18:00:04
Electronic Tap-Changers as Custom Power Tools,energy has acceptable reliability and quality (Billinton and Allan IEE J Electro Power 30(3):231–236, 1984). But for many decades, electricity suppliers had concentrated on generation, transmission and distribution of electrical energy to the consumers. This was while reliability and quality were no亲密 发表于 2025-3-24 21:40:58
http://reply.papertrans.cn/31/3065/306436/306436_19.pngOssification 发表于 2025-3-25 01:10:23
Aufbau und Ablauf des TANDEM-Projektesdays lighting was the most important load of consumers. Of course electrical motors loads have been gradually grown as major loads of the power systems. However, consumers could wait hours for the re-connection of electricity.