Osteoarthritis 发表于 2025-3-26 21:57:05

A Comparative Procedure for AC OHL and UGC Overall Cost,sation), were often taken as a sure cause to prefer a priori an overhead line in the network widening or reinforcing, without devoting the right consideration to the (sensibly different from cable to overhead lines) burdens deriving from territory impact and from the energy losses in the whole line

有常识 发表于 2025-3-27 01:26:46

http://reply.papertrans.cn/31/3004/300377/300377_32.png

GRIEF 发表于 2025-3-27 08:27:34

http://reply.papertrans.cn/31/3004/300377/300377_33.png

Flavouring 发表于 2025-3-27 10:44:23

10楼

IOTA 发表于 2025-3-27 17:11:45

10楼

换话题 发表于 2025-3-27 18:57:47

10楼

发表于 2025-3-28 00:20:58

10楼
页: 1 2 3 [4]
查看完整版本: Titlebook: EHV AC Undergrounding Electrical Power; Performance and Plan Roberto Benato,Antonio Paolucci Book 2010 Springer-Verlag London 2010 CP4622.E