The Commissioning Protocol,esponsibilities of the Commissioning Agent throughout the process. This chapter is a handbook style format for the Commissioning Agent; whether owner, design engineer, contractor or independent agent. Chapter 8 returns to the control personnel, and narrows the focus to the commissioning of the DDC s真繁荣 发表于 2025-3-30 14:46:09
Instrumentation,m verification purposes. It is important to recognize that the instrumentation tools required for DDC system commissioning are perhaps different from those used for daily troubleshooting purposes. A building Owner or Operator may carry some inexpensive and rugged tools for response to basic hot or cADORE 发表于 2025-3-30 20:31:38
Operator Training,rocess. Whether a vendor or contractor with an unnecessary warranty call, a building owner suffering “down time” or persistent occupant complaints, a design engineer suffering the reputation of an overly complicated system design or a design which simply does not work—it’s a shared frustration by al并入 发表于 2025-3-31 00:05:12
Human Factors, of the design and construction teams must therefore critically examine the effects of human factors on their work process. Finally, through building commissioning, the Commissioning Agent has the unique opportunity to analyze the human elements of the design and construction processes, and to mitig手段 发表于 2025-3-31 01:20:42
Controllability,ontrol loop tuning is not the only factor affecting controllability. Proper selection and application of controlled devices are fundamental to overall controllability. Still the source of common errors, a solid understanding of the principles for the sizing and selection of control valves and damper