险代理人
发表于 2025-3-25 06:20:35
http://reply.papertrans.cn/27/2688/268715/268715_21.png
蜿蜒而流
发表于 2025-3-25 08:15:38
http://reply.papertrans.cn/27/2688/268715/268715_22.png
枕垫
发表于 2025-3-25 11:43:05
http://reply.papertrans.cn/27/2688/268715/268715_23.png
不吉祥的女人
发表于 2025-3-25 16:40:28
Designing Manufacturing Flexibility in Dynamic Production Contexts,n the production problem to cope with uncertainty related to the evolution of product demand. The significance of this topic and its potential impact on the industrial sector in the medium-long run is testified by the interest shown by companies making initial efforts in this field.
Ardent
发表于 2025-3-25 20:36:11
http://reply.papertrans.cn/27/2688/268715/268715_25.png
飞来飞去真休
发表于 2025-3-26 03:29:45
http://reply.papertrans.cn/27/2688/268715/268715_26.png
深陷
发表于 2025-3-26 06:56:11
https://doi.org/10.1007/978-3-476-03919-4ring flexibility has to be revised and extended in order to include these solutions involving a “customized” or “focused” architectural flexibility. The current chapter shows the results from the case study research that empirically supports and casts insights in this trend. Based on these findings,
荧光
发表于 2025-3-26 11:34:37
http://reply.papertrans.cn/27/2688/268715/268715_28.png
伪造者
发表于 2025-3-26 13:47:24
https://doi.org/10.1007/978-3-476-03387-1 based on three main modules. The first module performs a setup planning procedure; the second module deals with the problem of pallet configuration, whereas the last module performs the sequencing of the part setups and generates a set of alternative process plans. These process plans will then be
欢笑
发表于 2025-3-26 17:35:03
https://doi.org/10.1007/978-3-658-35324-7ity and resource availability, this chapter presents a solution method based on multi-stage stochastic programming, to support the design of new manufacturing system architectures whose level of flexibility is focused on the specific production requirements. The problem variability is modeled throug