Forensic Evaluation of Bored Piles for a Factory Project at Jhajjarjoining piles helped confirm the bulging of piles at shallow depth. The paper highlights the importance of implementing a well-planned quality assurance program to confirm that all piles installed are of the desired quality.

liaison 发表于 2025-3-25 19:05:19

“Digital Specialist Foundations”—Using the Digital Twin During Project Execution manually recorded quality-relevant reports—during execution phase are displayed. In this context, the benefit of the digital twin to optimize processes, to reduce defect costs, for a more effective reporting system, and the further usage of as-built information in the BIM or GIS process are described.

Junction 发表于 2025-3-25 23:43:42

http://reply.papertrans.cn/27/2646/264550/264550_25.png

贫困 发表于 2025-3-26 02:49:14

http://reply.papertrans.cn/27/2646/264550/264550_26.png

spondylosis 发表于 2025-3-26 08:03:13

https://doi.org/10.1007/978-1-4842-8245-8ssed air use high pressure water to power the hammer. There are several benefits with using water DTH compared to air DTH, which are discussed in more detail in this paper. From a physics point of view, many of the benefits arise from the fact that water is an incompressible media and air is not. En

曲解 发表于 2025-3-26 09:58:21

https://doi.org/10.1007/978-1-4842-8245-8mar Mahal to Trombay reservoirs, Amar Mahal to Wadala and further up to Parel. The pipeline has to be underground and laid at a depth of 5.5 m. The initial proposal was to provide sheet piling to enable the safe excavation and installation of underground pipeline. However, installation of sheetpiles

原始 发表于 2025-3-26 15:04:20

https://doi.org/10.1007/978-1-4842-8245-8mulated amounts of approximately 600,000 m. of diaphragm wall (D-wall) and 58,000 m. of silicate gel grout plugs were executed for open excavation pits. In addition to the daily challenges, particular efforts are worth highlighting: for recovering a tunnel boring machine (TBM) of the client, a diaph

灾祸 发表于 2025-3-26 17:56:20

http://reply.papertrans.cn/27/2646/264550/264550_30.png
页: 1 2 [3] 4 5 6
查看完整版本: Titlebook: Deep Foundations for Infrastructure Development in India; Proceedings of DFI-I A. Murali Krishna,Subhadeep Banerjee,N. Kumar Pitc Conferenc