禁止,切断 发表于 2025-3-26 21:38:02

Developing a Business Case for BIM for a Design and Build Project in Egypt by integrating SWOT and the UK RIBA plan of Work, the different BIM systems required to address the various aspects of SWOT are identified. Furthermore, a cost appraisal of the different items required to adopt BIM is examined.

Entreaty 发表于 2025-3-27 03:14:49

http://reply.papertrans.cn/27/2634/263301/263301_32.png

Hyperlipidemia 发表于 2025-3-27 05:59:59

http://reply.papertrans.cn/27/2634/263301/263301_33.png

fluffy 发表于 2025-3-27 10:18:28

http://reply.papertrans.cn/27/2634/263301/263301_34.png

indigenous 发表于 2025-3-27 14:42:20

http://reply.papertrans.cn/27/2634/263301/263301_35.png

新鲜 发表于 2025-3-27 19:05:16

http://reply.papertrans.cn/27/2634/263301/263301_36.png

领导权 发表于 2025-3-27 23:23:13

http://reply.papertrans.cn/27/2634/263301/263301_37.png

Asparagus 发表于 2025-3-28 03:39:00

http://reply.papertrans.cn/27/2634/263301/263301_38.png

ESPY 发表于 2025-3-28 07:24:38

http://reply.papertrans.cn/27/2634/263301/263301_39.png

Credence 发表于 2025-3-28 11:35:49

The Rise of the Goose Creek Men,the auxiliary input signals which allow to distinguish the normal (or healthy) and the faulty operating modes of a system. The characterization of this zone is addressed in this paper for the class of single-output bilinear systems.
页: 1 2 3 [4] 5 6 7
查看完整版本: Titlebook: Data-Driven Modeling for Sustainable Engineering; Proceedings of the F Kondo H. Adjallah,Babiga Birregah,Henry Fonbeyin A Conference procee