刚毅 发表于 2025-3-25 05:53:05
Dam Breaching,ering, dams continue to fail. For example, the period 1946 to 1955 has on record 12 major failures and 2000 new dams constructed, while the period 1956 to 1965 records 24 failures and 2500 new dams (Johnson and Illes, 1976). The cause of this apparent increase in failures is a matter of conjecture.dragon 发表于 2025-3-25 10:29:41
http://reply.papertrans.cn/27/2603/260291/260291_22.pngForage饲料 发表于 2025-3-25 12:21:41
http://reply.papertrans.cn/27/2603/260291/260291_23.png现存 发表于 2025-3-25 17:41:51
http://reply.papertrans.cn/27/2603/260291/260291_24.pngvascular 发表于 2025-3-25 23:44:36
Mathematical Models of Dam Breaching,neous dam failure. In the last two decades or so, public interest in dam safety has heightened significantly which, in turn, has stimulated and augmented research on various facets of dam failure. As a result, a number of mathematical models have been developed and reported in the literature (Seemanchlorosis 发表于 2025-3-26 00:30:22
http://reply.papertrans.cn/27/2603/260291/260291_26.pngNeedlework 发表于 2025-3-26 07:11:50
http://reply.papertrans.cn/27/2603/260291/260291_27.pngcongenial 发表于 2025-3-26 08:51:06
http://reply.papertrans.cn/27/2603/260291/260291_28.pngChagrin 发表于 2025-3-26 13:48:44
C. A. Perucci,M. Arcà,T. Spadeaund the world for hydro-electric power generation, flood control, irrigation, water supply, navigation, recreation, and other purposes. Furthermore, large embankments have inherent ability to accommodate a broader range of site conditions than would be suitable for more rigid dams (Jansen, 1988).幻想 发表于 2025-3-26 20:30:14
Fons J. R. van de Vijver,Jia He, disaster alleviation, and damage assessment. Some of these elements are interconnected as shown in Figure 3.1. A complete mathematical model incorporating all of these elements does not appear to have been reported yet. Most models are based on two or more elements that hover around breach formation and dam-breach flood routing.